Site start
Housing site start — Meadowlands
Meadowlands, Cork
1 commencement notice · start date 31 Dec 2024 · no planning reference given
Planning Section 179A · Planning application
- Commencement notices
- 1
- Latest start date
- 31 Dec 2024
- Latest notice
- 1,710 m²
- Planning references
- None given
- Location
- Meadowlands, Cork
Location
Where the site is
- Area
- Meadowlands, Cork
- County
- Cork
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The Construction of a new housing development consisting of; 18no Residential units plus 1no Acquired Brain Injury Ireland (ABII) 5-Bed communal dwelling consisting of; 4no 1bed single storey units, 4no 2bed single storey units, 6no 2bed two storey units, 4no 1bed own door apartments, 1no ABII 5bed communal dwelling and all associated siteworks.
Floor area stated for this source: 1,710 m².
Source unit value with scope not stated: 19 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.