Site start
Housing site start — Mullaghmore
Mullaghmore, Sligo
1 commencement notice · start date 25 Nov 2019 · planning reference given
Planning PL 19/39
- Commencement notices
- 1
- Latest start date
- 25 Nov 2019
- Latest notice
- 1 house
- Planning reference
- PL19/39
- Location
- Mullaghmore, Sligo
Location
Where the site is
- Area
- Mullaghmore, Sligo
- County
- Sligo
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
24.09 sqm single storey extension to detached dwelling house. Modification of existing attached garage and utility space to provide 1 no. additional bedroom and bathroom. The provision of external terrace areas, associated landscaping works, a new shed, the resurfacing of the existing driveway and the widening of existing vehicular access to public road
Floor area stated for this source: 171 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.