Site start
Housing site start — Athy
Athy, Kildare
1 commencement notice · start date 01 May 2025 · planning reference given
Planning 19233 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 01 May 2025
- Latest notice
- 25 units
- Planning reference
- 19233
- Location
- Athy, Kildare
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 19233 Kildare County Council · checked 2026-07-29T15:43:41+00:00
Planning 19233 — CONDITIONAL · Decision 2020-01-17 · Final grant 2020-02-21
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Athy, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Kildare County Council planning record Application details, status and decision record for 19233. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Phase 3 (25 DWELLINGS) of a three phase housing development to include erection of (a) 50 residential units comprising 2 no. two storey 100m2 3 bedroom semi-detached dwelling houses (House Type F),16 no. two storey 89.5m2 2 bedroom town houses (House Type G), 3 no. two storey apartment blocks (Block I) comprising 6 no. ground floor 73.93m2 2 bedroom apartments and 6 no. first floor 49.76m2 1 bedroom apartments, 5 no. three storey duplex blocks (Block H) comprising 10 no. ground floor 73.93m2 2 bedroom apartments and 10 no. 100m2 3 bedroom duplex apartments on first and second floors to include car parking, bin stores, bicycle stores and boundary wall, (b) new site entrance off Geraldine Road with access road, cycleway and footpath (c) provide vehicular and pedestrian access to adjoining site to south west comprising 0.8453 hectares currently zoned “C” New Residential (d) all site development works associated with main access road and phase 3 of the three phase residential development including footpaths, roads, public lighting, attenuation ponds, surface water drains, foul sewer drains, water mains and all other utility services necessary to service the proposed development at Clonmullen & Gallowshill,Geraldine Road,Athy,Co. Kildare.
Floor area stated for this source: 2,021 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.