Commencement notice group

Housing commencement notices — Quin

Quin, Clare

1 unique commencement event · latest notified commencement 18 May 2026 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
18 May 2026
Latest notice
176 m²
Planning references supplied
2560840
Public location
Quin, Clare

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Quin, Clare
County
Clare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Clare County Council planning record Application details, status and decision record for 2560840. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

For the development which will consist of the demolition of the existing dwelling down to foundation level. The proposed development will be constructed on the same footprint as the existing structure, with the addition of a new porch to the front, single-storey extension to the rear and an additional storey added to the side of the dwelling, and all associated site works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 176 m².

Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.

Planning reference 2560840

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.