Site start

Housing site start — Rush

Rush, Dublin

1 commencement notice · start date 07 Jan 2019 · planning reference given

Planning F18A/0396 · Planning application

View full project timeline

Commencement notices
1
Latest start date
07 Jan 2019
Latest notice
1 house
Planning reference
F18A/0396
Location
Rush, Dublin

Location

Where the site is

Area
Rush, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Two storey house with a dormer style third floor to the rear and with vehicular entrance on to Old Barrack Road with off street parking for 2 cars and for associated site works to include providing new public footpath along Old Barrack Road. It is proposed to remove existing fire damaged house structure.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 210 m².

Planning reference F18A/0396

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.