Site start
Housing site start — Dublin
Dublin 17, Dublin
1 commencement notice · start date 03 Aug 2021 · planning references given
Planning ABP 307887 - SHD0017/20
- Commencement notices
- 1
- Latest start date
- 03 Aug 2021
- Latest notice
- 191 units
- Planning references
- SHD0017/20 · ABP-307887
- Location
- Dublin 17, Dublin
Location
Where the site is
- Area
- Dublin 17, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-307887. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Site 2, Northern Cross: Construction of a new residential development. The development will consist of 191 residential units across 5 cores. Construction of 191 no. residential units in a part seven, part eight and part nine storey building, over a lower ground floor/upper basement level and lower basement level. The development includes private amenity space in the form of balconies / terraces for all apartments, public and communal open space at podium, ground floor and roof level, PV panels at roof level, pedestrian access routes, children's play space, foul and surface water drainage, hard and soft landscaping, lighting, alterations to the adjacent public park, including provision of a play area, and all associated and ancillary site works. Bin stores, plant rooms, storage rooms, management areas and the ESB substation, which are provided with external access doors, are located at lower ground floor / upper basement level and lower basement level.
Floor area stated for this source: 18,146 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.