Site start
Housing site start — Ballsbridge
Ballsbridge, Dublin
1 commencement notice · start date 29 Jan 2018 · planning reference given
Planning 2503/17
- Commencement notices
- 1
- Latest start date
- 29 Jan 2018
- Latest notice
- Scale not stated
- Planning reference
- 2503/17
- Location
- Ballsbridge, Dublin
Location
Where the site is
- Area
- Ballsbridge, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Proposed alterations and extension of existing dwelling. Including a single storey extension to the rear, removal of the mansard roof and provision of a new roof profile with the addition of a dormer window to the front and velux roof light to the rear roof slope, alteration to front facade and the widening of the existing vehicular and pedestrian entrance.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.