Site start
Commercial site start — Tralee
Tralee, Kerry
1 commencement notice · start date 05 Jun 2023 · no planning reference given
Planning Part 8 by Kerry County Council
- Commencement notices
- 1
- Latest start date
- 05 Jun 2023
- Latest notice
- 660 m²
- Planning references
- None given
- Location
- Rathass, Tralee, Kerry
Location
Where the site is
- Area
- Tralee, Kerry
- County
- Kerry
Addresses on the notices
- Rathass, Tralee, Kerry
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The works shall consist of the following scope of works • The provision of a new Modular Office Building at Aras an Chonate with a minimum 30 year design life in accordance with this specification and drawings. • The manufacturer shall provide BCAR Certification for the Modular Building. • The Modular building shall be a minimum of a Near Zero Energy Building in accordance with current Building Regulations. The building fabric shall be designed and constructed with U-Values for walls, roofs and floors of less than 0.15 W/m2K, installed windows of 0.85 W/m2K, airtightness of 0.6 ACH or better when tested at 50 pascals and with thermal bridge free design. • The manufacturer will be required to provide all design calculations and documentation to demonstrate compliance with the Building Regulations and Technical Guidance Documents (Parts A to M) for the Modular Building.
Floor area stated for this source: 660 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.