Commencement notice group
Commencement notices — Drumganagh
Drumganagh, Mayo
1 separate notice · latest notified commencement 22 Oct 2025 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 22 Oct 2025
- Latest notice
- Scale not stated
- Planning references supplied
- P25/20
- Public location
- Drumganagh, Mayo
Public source geography
Site location
- Public site / locality
- Drumganagh, Mayo
- County
- Mayo
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
upgrade works to improve water quality, comprising upgrade of raw water pumps, installation of equipment to improve process including a new flocculation tank, clarification tank, rapid gravity filters, UV reactor and associated pumps, and accessories. Construction of solids management consisting of tank for settlement and associated pumps and infrastructure. Reservoir tank improvement including pump pipework mixer, and all associated ancillary works and associated engineering works including upgrade to pump house machinery. All works will be conducted within the existing GWS site and pumphouse
Scale not stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.