Site start
Construction of one detached auxiliary habitable dwelling of approximately 32 m²
Celbridge, Kildare
1 commencement notice · start date 07 Nov 2026 · no planning reference given
- Commencement notices
- 1
- Latest start date
- 07 Nov 2026
- Latest notice
- 32 m²
- Planning references
- None given
- Location
- Celbridge, Kildare
Location
Where the site is
- Area
- Celbridge, Kildare
- County
- Kildare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Construction of one detached auxiliary habitable dwelling of approximately 32 m² to the rear of the existing principal dwelling, under Class 3A exempted development. The works comprise a kitchen/living area, one bedroom, bathroom/en-suite, storage area, external openings, and all associated site, drainage and service-connection works. The auxiliary dwelling will be linked to the services of the principal house.
Floor area stated for this source: 32 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.