Site start

Site start — Shannon

Shannon, Clare

1 commencement notice · start date 15 Dec 2021 · planning reference given

Planning P20478 & P2145

Commencement notices
1
Latest start date
15 Dec 2021
Latest notice
200 m²
Planning reference
P20478
Location
Shannon Free Zone, Shannon, Clare

Location

Where the site is

Area
Shannon, Clare
County
Clare

Addresses on the notices

  • Shannon Free Zone, Shannon, Clare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction & fitout of first floor laboratories and associated services at MeiraGTx, Building 2, Block K, Airport Avenue, Shannon Free Zone, Shannon County Clare as permitted under Planning Permission Ref No.s P20478 & P2145.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 200 m².

Planning reference P20478 Developer stated: MeiraGTx Ireland DAC

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.