Commencement notice group
Building extension commencement notices — Virginia
Virginia, Cavan
2 unique commencement events · latest notified commencement 08 Nov 2021 · planning reference supplied
- Unique commencement events
- 2
- Latest notified commencement
- 08 Nov 2021
- Latest notice
- 3 m²
- Planning references supplied
- 21/124
- Public location
- Virginia, Cavan
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 21/124 Cavan County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Virginia, Cavan
- County
- Cavan
- Notice source points are up to 91.7 km apart, so no combined representative point is shown.
Source positions remain separate:
- CN0083240CN · 53.142367, -7.692054 Open point
- CN0082391CN · 53.888160, -7.100750 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Cavan County Council planning record Application details, status and decision record for 21/124. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of a new double garage and hobby/gym and associated site works
Floor area stated for this source: 3 m².
Alterations to existing front façade windows, covering in of existing porch, extension to existing sunroom and covered patio area, new dormer to rear roof area and new walls and railings to existing entrance and associated ground works Lissannymore Virginia Co Cavan
Floor area stated for this source: 322 m².
Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.