Site start

Housing site start — Tullamore

Tullamore, Offaly

2 commencement notices · latest start date 19 Oct 2022 · planning reference given

Planning 21/351 · Council file · external

View full project timeline

Commencement notices
2
Latest start date
19 Oct 2022
Latest notice
270 m²
Planning reference
21/351
Location
Tullamore, Offaly

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
1
  1. Completion certificate recorded — source scope not stated Offaly County Council · commencement notice Completion certificate · First observed in the official monthly source 2022-10 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Tullamore, Offaly
County
Offaly

Addresses on the notices

  • 1st floor level to rear and all associated works and services
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Offaly County Council planning record Application details, status and decision record for 21/351. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Change of use of ground floor from Post Office to restaurant and construction of extension on ground floor eastern elevation to the rear, incorporating extension to proposed dining area. Ground floor will include dining area, toilets, kitchen, stores. Staff cloaks at 1st floor level to rear and all associated works and services. This is a protected structure 23-219 and NIAH 14807023.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 270 m².

Planning reference 21/351
Notice 2 Commencement notice (owner-supplied)

Coyle L: Change of use of Gr. Floor from PO To Restaurant and change of use of 1st & 2nd floor apartments from offices to 3 no. apartments including all associated works and services.(Protected structure).

Work stated for this notice Scale not stated for this notice.
Planning reference 21/351

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.