Site start

Commercial site start — Dublin

Dublin 22, Dublin

5 commencement notices · latest start date 30 Dec 2025 · planning reference given

Planning SD23A/0123 · Planning application · Council file · external

View full project timeline

Commencement notices
5
Latest start date
30 Dec 2025
Latest notice
60 m²
Planning reference
SD23A/0123
Location
Dublin 22, Dublin

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
2
Completion certificates
2
  1. Completion certificate recorded — source scope not stated South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2023-11 1 units stated for this certificate · One certificate representation
  2. Completion certificate recorded — source scope not stated South Dublin County Council · commencement notice Completion certificate · First observed in the official monthly source 2024-07 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Dublin 22, Dublin
County
Dublin

Addresses on the notices

  • Dublin
  • Pfizer Grangecastle
Location evidence needs care
  • Notice source points are up to 2.3 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 53.323000, -6.435842 Open point
  • Public notice source · 53.326080, -6.435843 Open point
  • Public notice source · 53.323222, -6.400878 Open point
  • Public notice source · 53.326125, -6.435874 Open point
  • Public notice source · 53.326074, -6.435832 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD23A/0123. South Dublin County Council Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Pfizer Grange Castle - DS2 - Guardhouse and associated works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 60 m².

Planning reference SD23A/0123
Notice 2 Commencement notice (owner-supplied)

Single Storey Chiller Plantroom - Ancillary Service Building. DS2 Biopharmaceutical Manufacturing Facility - Pfizer Grange Castle. Grange Castle Business Park. Nangor Road. Dublin 22.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 370 m².

Planning reference SD23A/0123
Notice 3 Seven-day notice

5-level extension to the existing DS1 biopharmaceutical manufacturing building at Pfizer Grangecastle

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,661 m².

Planning reference SD23A/0123
Notice 4 Commencement notice

Single Storey steel framed warehouse extension with high bay, 3,200sqm, 17.25m high with roof mounted solar panels.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 3,200 m².

Planning reference SD23A/0123
Notice 5 Seven-day notice

6-storey steel and concrete framed biopharmaceutical manufacturing building with a single storey link corridor connection back to existing facility on campus.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 32,156 m².

Planning reference SD23A/0123

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.