Site start
Site start — Ringsend
Ringsend, Dublin
1 commencement notice · start date 23 Jan 2019 · planning reference given
Planning DSDZ4478/17
- Commencement notices
- 1
- Latest start date
- 23 Jan 2019
- Latest notice
- 110 m²
- Planning reference
- DSDZ4478/17
- Location
- Ringsend, Dublin
Location
Where the site is
- Area
- Ringsend, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The removal of 1no. existing storage container (c.13.9 sq m GFA) and replacement with part single, part two storey, remodelled shipping containers (c.110.07 sq m GFA) to provide accommodation to be used by a water based activity group. This will include a meeting space, gym and shower/changing facilities. All associated site development works including 4no. bicycle parking spaces. All on a site of c.0.03 hectares.
Floor area stated for this source: 110 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.