3 unique commencement events · latest notified commencement 13 Aug 2026 · planning reference supplied
- Unique commencement events
- 3
- Latest notified commencement
- 13 Aug 2026
- Latest notice
- 156 units
- Planning references supplied
- ABP-320912-24
- Public location
- Dublin, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Dublin, Dublin
- County
- Dublin
Notice location variants
- Ground level SN0014628DR
- Lower Ground Level with an internal courtyard at Ground Level SN0014601DR
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-320912-24. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The project involves the construction of two blocks (3A & 3B) over a common basement carpark with internal courtyard at Ground level. The building will consist of 156 open-plan apartments, ancillary accommodations on the basement floor level and restaurant, amenity and retail areas on the ground floor level.
Floor area stated for this source: 18,022 m².
The proposed development Block 7 will be consisting of three residential buildings, combined with a cark park under the podium. No. 2 commercial units are located on the Ground Floor level of one of the buildings. The buildings are ranging between five and six storeys
Floor area stated for this source: 23,550 m².
The project involves the construction of four blocks (10A, 10B, 10C & 10D) over a podium carpark at Lower Ground Level with an internal courtyard at Ground Level. Each Block is served by a single escape stair. The tallest block (Block B) of Building 10 is 23.9 m tall with a top storey height of 19.2 m.
Floor area stated for this source: 19,280 m².