Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 21 Feb 2025 · planning reference given
Planning D24B/0411/WEB · Planning application
- Commencement notices
- 1
- Latest start date
- 21 Feb 2025
- Latest notice
- 210 m²
- Planning reference
- D24B/0411/WEB
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of: 1) Construction of new dormer to rear of the main house roof to facilitate a habitable attic conversion. 2) Change of roof from hipped to gabled with extended gable wall, including new window to side elevation, and velux rooflight to rear slope. 3) All associated demolitio ns/alterations, internal layout changes, drainage and ancillary works.
Floor area stated for this source: 210 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.