Site start · Co. Cavan
Virginia, Cavan
Site start 7 Nov 2024
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.
Search the Cavan planning registerCurrent planning applications in Virginia
What and where
Works to upgrade the Virginia Wastewater Treatment Plant off the N3…
for works to upgrade the Virginia Wastewater Treatment Plant off the N3 in the townland of Rathardum and Terminal Pumping Station off New Street, in the townland of Virginia, Virginia, Co. Cavan. The proposed development comprises upgrade works to the existing terminal pumping station (TPS) site and waste water treatment plant (WWTP) site. The development at the WWTP site will consist of 1) provision of inlet works; 2) provision of a control storm water overflow chamber; 3) provision of stormwater storage tank; 4) provision of Dual function Overflow outfall to Lough Ramor to replace existing (to be decommissioned) SWO outfall at the TPS; 5) provision of tertiary treatment system (tanks and filter) with all associated ancillary works; 6) provision of 4 no. buildings for operating equipment; 7) provision of wash water recycle system to clean equipment; 8) provision of outfall pump station; 9) demolition of existing sludge tank and replacement with sludge thickening unit and sludge holding tank; 10) provision of biological treatment tank; 11) provision of below ground pump chambers and process drainage sumps; 12) provision of odour control unit and above ground duct work; 13) provision of back-up generator with bunded diesel tank; 14) provision of an ESB substation; 15) provision for internal hardstanding accessways; and 16) ancillary and associated development including removal of existing trees and vegetation on the site, and replacement tree planting, minor structural alterations to existing tanks, and mechanical and electrical service connections. The development at the TPS site will consist of 1) demolition and replacement of existing foul pump sump; 2) provision of additional rising main across the River Blackwater to the WWTP; 3) decommissioning of the existing stormwater overflow; 3) repurposing the existing stormwater settlement tank as emergency storage tank, with minor demolition works and increased height of tank; 4) mass fill to raise floor levels of inlet chambers; 5) provision of high level emergency overflow to River Blackwater; 6) replacement of existing boundary palisade fence with new boundary wall along the north, west and south boundary of the TPS, and a fence along the river edge on the eastern boundary. The site will be extended to the north-west; 7) upgrade to existing site entrances; 8) provision of 3 no. kiosks for operating equipment and welfare facilities; 9) provision of odour control unit and above ground duct work; and 10)
- Location
- Virginia, Co. Cavan Map
- Council
- Cavan County Council
- Planning reference
- 22489
Key facts
- Project type
- Infrastructure
- Site start
- 7 Nov 2024
Documents and evidence
Check the record
- Council planning fileThe application file 22489 on eplanning.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Cavan County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 7 Nov 2024Work started · Construction of a kiosk to contain MCC electrical equipment as part of the Virginia...