Planning application · Co. Cavan
Swellan Upper, Cavan, Co. Cavan
Under appeal since 5 Dec 2024 (Granted 12 Nov 2024 by the council)
We no longer update this application, so we can't email you about it. Get new planning applications in Swellan Upper by email
Key facts
- Planning application 2460265 at Swellan Upper, Co. Cavan: 20 homes.
- It was received by Cavan County Council on 14 Jun 2024.
- Status: Under appeal since 5 Dec 2024 (Granted 12 Nov 2024 by the council).
Source: the Cavan County Council planning register, as last seen on 5 Oct 2026. Open the council's file
More planning applications in Swellan Upper · Planning applications in Co. Cavan
Council register
The council's register shows: Granted on 12 Nov 2024.
Appealed to An Coimisiún Pleanála on 5 Dec 2024.
Search the Cavan planning register
Application details as we last saw them in the national register on 5 Oct 2026.
What and where
20 homes
for the construction of a residential development scheme containing 20 no. residential units consisting of 16 no. 3 bedroom (2 storey) units, 2 no. 2 bedroom (2 storey) units and 2 no. 2 bedroom (1 storey) units with / without attic accommodation. The proposed development also includes the use of an existing entrance to this site for access to this new estate (including the provision of new footpaths both inside and outside the site, the latter of which will link with the existing public paths), for connections to existing foul sewer, public watermain and surface water drainage network, the creation of landscaped communal open spaces, as well as all ancillary and associated site developments works including alterations to existing land levels and boundary wall / fence and gateway. SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED.
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Swellan Upper, Co. Cavan Map
- Council
- Cavan County Council
- Planning reference
- 2460265
Numbers and dates
- Homes
- 20
- Floor area
- 2,389 m²
- Estimated construction value
- €3.6m to €4.6mOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Received
- 14 Jun 2024
- Council decision
- 12 Nov 2024
- Appeal lodged
- 5 Dec 2024
- Site start notified
- 31 Dec 2024
Timeline
- Application received
- Granted by the council
- Appeal lodged
- Site start notified
Site history
This site's history
-
Application 2660379 at the same address: received 3 Jul 2026, no decision recorded yet.
for 21 no. residential units consisting of 14 no. 3 bedroom (2 storey) units, 4 no. 1 bedroom units in one 2 storey block, 1 no. 4 bed… Same address
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2460265 on eplanning.ie: drawings, reports and the decision.Open the council's file
- AppealUnder appeal · 321392 / 5 Dec 2024View the appeal record
- From the planning documentsRead from Design Statement in the council's file.
- Homes
- 20
- Site area
- 0.95 ha
- Scope
- The proposed development is a residential housing scheme of 20 units on a 0.95ha infill site in Swellan Upper, Cavan, designed to integrate with the surrounding area and provide a mix of high-quality homes.
How we know this
From the Cavan County Council planning register, as last seen on 5 Oct 2026. The council's own file is the official record. Facts from the planning documents were read from the documents in that file.
Site starts
Site starts and completion
- 31 Dec 2024Notice filed · Erection of mixed residential development of 18 no. dwellings, access via existing...View the site start
- Completion certificate recordedRecorded in Dec 2024 · 4 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area