Key facts

  • Planning application 2560670 at Lands At Lisdaran Townland, Loreto Road, Cavan Town: Large Scale Residential Development consististing of the provision…
  • The applicant is Lisdaran Developments Ltd. The agent is Ronan Woods.
  • It was received by Cavan County Council on 13 Nov 2025.
  • Status: Decision to grant 23 Jul 2026.
  • The council decided on 23 Jul 2026 to grant permission. Final grant not yet recorded. No site start has been filed yet.

Source: the Cavan County Council planning register, checked 19 Aug 2026. Open the council's file

More planning applications in Cavan Town · Planning applications in Co. Cavan

What and where

Large Scale Residential Development consististing of the provision…

for Large Scale Residential Development consististing of the provision of a total of 109no. residential units along with provision of a crèche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 65no. residential dwellings which will consist of 23no. 2 bed units, 26no. 3 bed units and 16no. 4 bed units. (c) The provision of a total of 44no. duplex apartment units consisting of 8no.1 bed units, 18no. 2bed units and 18no. 3 bed units. The duplex apartment units range in height from two storey to three storey. (d) Provision of a two storey creche with associated parking, bicycle and bin storage. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and duplex apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle, bin and bulky items storage facilities for duplex apartment units. (h) Upgrading the existing access point from Loreto Road with associated works to include for provision of a right turning lane, provide for internal access roads, footpaths and associated site works. (i) Provision of internal access roads and footpaths and associated works to include for regrading of site levels as required along with connections onto the Greenway. (j) Provision of residential communal open space and public open space areas to include formal play areas along with all hard and soft landscape works with public lighting, planting and boundary treatments to include boundary walls, railings & fencing. (k) Internal site works and attenuation systems which will include for provision of hydrocarbon and silt interceptors prior to discharge. (l) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul sewer, water connections and ESB network connections along with provision of an ESB substation. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application - SIGNIFICANT FURTHER INFORMATION HAS BEEN RECEIVED

Description as published by the council. Its text starts part-way through a sentence.

Location
Cavan Town, Co. Cavan Map
Planning reference
2560670
Applicant
Lisdaran Developments Ltd

Numbers and dates

Received
13 Nov 2025
Decision to grant
23 Jul 2026Final grant not yet recorded

Timeline

  1. Application received
  2. Decision to grant
  3. Appeal lodged

Outlook

What happens next

The council decided on 23 Jul 2026 to grant permission. Final grant not yet recorded. No site start has been filed yet.

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • Crèche or childcare facilityNamed in the application description
  • LandscapingNamed in the planning documents
  • GroundworksNamed in the planning documents
  • RainwaterNamed in the planning documents

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

Reviewed build intelligence

What the documents establish

Government document review

The council decided to grant 109 homes (65 houses and 44 duplex apartments) and a creche on 23 July 2026 with 56 conditions. Commission appeal 324586 is pending. Application design options, later consultant review and council conditions are distinct evidence stages; no final grant or installed specification is established.

4 official documents inspected · Checked 2026-09-05 · Official file index

Heat-pump selection is inconsistent within the energy report

Source details need reconciliation · Internal conflict within the July 2025 Revision 0.0 energy statement

What the evidence says
The July 2025 energy statement retains gas boilers with solar panels and air-source heat pumps as options on PDF page 13. Page 19 repeats alternatives, then says there will be no gas connection and that heating and hot water will use heat pumps exclusively. The report therefore does not consistently establish the selected heating strategy.

Why it may matter — interpretation
Interpretation: identifies the services decision that needs clarification before a product or utility package can be treated as selected.

What is not established
No later signed heating schedule, capacity, manufacturer, refrigerant, gas connection or installed system was verified.

Inspect the evidence

Lisdaran LRD: Energy Efficiency and Climate Change Adaptation Design Statement · p.13
Option 1 - Gas Fired Boilers with Solar Panels. · Issued July 2025 (month only) · Revision 0.0; received 13 November 2025 · Checked 2026-09-05

Option 1 - Gas Fired Boilers with Solar Panels.

Lisdaran LRD: Energy Efficiency and Climate Change Adaptation Design Statement · p.19
exclusively utilize heat pumps · Issued July 2025 (month only) · Revision 0.0; received 13 November 2025 · Checked 2026-09-05

exclusively utilize heat pumps

Calculation list contains 97 proposed Phosco fittings

Source details need reconciliation · Pre-curfew calculation parts list in the draft R03 lighting report, 17 October 2025

What the evidence says
The October 2025 pre-curfew calculation parts list contains 25 Phosco P852K fittings at 24 W, 7 at 28 W and 65 at 38 W: 97 modelled fittings. Those entries use the 730 model variants. Separate specification tables on PDF pages 6 and 7 contain 740 variants for two types, so the final model codes are not treated as settled.

Why it may matter — interpretation
Interpretation: provides a source-scoped lighting quantity and product family, while exposing the inconsistent variant codes.

What is not established
These are modelled fittings, not installed quantities or an awarded supply order. A reconciled current schedule and final approved product variant remain unconfirmed.

Inspect the evidence

Lisdaran: Site Lighting Report · p.6
TYPE PL2 · Issued 2025-10-17 · Draft issue R03; received 13 November 2025 · Checked 2026-09-05

TYPE PL2

Lisdaran: Site Lighting Report · p.7
TYPE PL3 · Issued 2025-10-17 · Draft issue R03; received 13 November 2025 · Checked 2026-09-05

TYPE PL3

Lisdaran: Site Lighting Report · p.13
Luminaire parts list · Issued 2025-10-17 · Draft issue R03; received 13 November 2025 · Checked 2026-09-05

Luminaire parts list

Later ecology memo supports the R03 lighting design

Consultant recommendation · Ecology review dated 28 May 2026 and received 30 May 2026

What the evidence says
The 28 May 2026 ecology memorandum says it reviewed the R03 lighting report and recommends approval of the lighting plan on nocturnal-species grounds, subject to correct implementation. This is a consultant recommendation submitted in further information, not itself the council approval or a product order.

Why it may matter — interpretation
Interpretation: connects the original lighting design to the later further-information review without upgrading the reviewer recommendation into final approval.

What is not established
A full later approved lighting schedule, installation certification and reconciliation of the report model-code differences were not inspected.

Inspect the evidence

Lisdaran: memorandum reviewing the lighting plan · p.1
our recommendation · Issued 2026-05-28 · Further-information ecology review; received 30 May 2026 · Checked 2026-09-05

our recommendation

Council required 10% functioning EV charging

Council decision under appeal · Condition 40 in the council decision to grant, under appeal 324586

What the evidence says
Condition 40 of the 23 July 2026 council decision requires functioning EV charge points at a minimum of 10% of all car parking spaces, with ducting for the remaining spaces. Any outstanding proposals must be agreed in writing before occupation.

Why it may matter — interpretation
Interpretation: distinguishes working charge-point provision from parking prepared for future charging.

What is not established
Charger numbers, power ratings, selected manufacturer, appointed operator and completed works are not established.

Inspect the evidence

Cavan 25/60670: notification of decision to grant · p.10
A minimum of 10% · Issued 2026-07-23 · Council decision with 56 conditions; appeal 324586 remains pending · Checked 2026-09-05

A minimum of 10%

Council rejected two submitted boundary treatments

Council decision under appeal · Condition 8 in the council decision to grant, under appeal 324586

What the evidence says
Condition 8 does not permit Boundary Treatment Type 6 or the submitted treatment beside the creche. It requires alternative details to be agreed in writing before development begins.

Why it may matter — interpretation
Interpretation: records a specific later design change affecting boundary works rather than presenting every submitted detail as accepted.

What is not established
The rejected drawing materials and the eventual replacement detail were not inspected. No constructed fence or wall is established.

Inspect the evidence

Cavan 25/60670: notification of decision to grant · p.5
Boundary Treatment Type 6 · Issued 2026-07-23 · Council decision with 56 conditions; appeal 324586 remains pending · Checked 2026-09-05

Boundary Treatment Type 6
Remaining document questions
  • Which later official decision, approved detail or revision changes these source-specific findings?
  • Has a phase-specific official record established the selected equipment or installed specification?

Selected pages of 4 government-published PDFs were visually inspected. Four government-published PDFs were inspected on selected pages, not all 250 registry rows. No complete engineering or condition-discharge review was performed. Proposals do not establish procurement or installed work.

How we know this

From the Cavan County Council planning register, checked 19 Aug 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.

Explore the area

More planning activity near Cavan Town

Get alerts for Cavan TownFree. We email you when new applications appear.

Free email alerts

Get new Cavan Town projects by email

New applications, decisions and site starts in Cavan Town, Co. Cavan. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

Email alerts for this applicationMore alert options