Small residential · Co. Cavan
Upper Kilconny, Belturbet, Co. Cavan
Granted 16 Jul 2026
Key facts
- Planning application 2660297 at Upper Kilconny, Belturbet, Co. Cavan: 2 homes.
- The applicant is Ivan & Claire Mayne. The agent is Noel Smith.
- It was received by Cavan County Council on 28 May 2026.
- Status: Granted 16 Jul 2026.
- Work started on site on 27 Sep 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Cavan County Council planning register, checked 6 Aug 2026. Open the council's file
More planning applications in Belturbet · Planning applications in Co. Cavan
What and where
2 homes
to extend existing single storey extension and raise to two-storey to existing two-storey dwelling, associated site works and connect to existing services
Description as published by the council. Its text starts part-way through a sentence.
- Location
- Belturbet, Co. Cavan Map
- Council
- Cavan County Council
- Planning reference
- 2660297
- Applicant
- Ivan & Claire Mayne
- Agent
- Noel Smith
Numbers and dates
- Homes
- 2
- Floor area
- 60 m²per planning documents
- Estimated construction value
- €180k to €230kOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Small residential
- Received
- 28 May 2026
- Granted
- 16 Jul 2026
- Site start
- 27 Sep 2026
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2660297 on eplanning.ie: drawings, reports and the decision.Open the council's file
- From the planning documentsRead from Application Form - Part A in the council's file.
- Floor area
- 60 m² (per planning documents)
- Site area
- 0.07 ha
- Scope
- Extend an existing single storey extension and raise it to two-storey at an existing two-storey dwelling, with associated site works and connection to existing services.
- Wastewater
- “connect to existing services; public sewer”
- Rainwater
- “surface water disposal to public sewer/drain”
- Groundworks
- “associated site works”
How we know this
From the Cavan County Council planning register, checked 6 Aug 2026. We link to the council's own file so you can check the official record before you act. Facts from the planning documents were read from the documents in that file.
Site starts
Commencement notices for this permission
- 27 Sep 2026Work started · extend existing single storey extension and raise to two-storey to existing two- storey...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.