Commercial new build · Co. Cork
The existing Pfizer site in Ballintaggart and Ballybricken Ringaskiddy Co. Cork
Granted 22 Jun 2021 (final grant issued 3 Aug 2021)
We no longer update this application, so we can't email you about it. Get new planning applications in Co. Cork by email
Key facts
- Planning application 21/5132 at The Existing Pfizer Site In Ballintaggart and Ballybricken Ringaskiddy Co. Cork: New Clinical Manufacturing Facility.
- It was received by Cork County Council on 28 Apr 2021.
- Status: Granted 22 Jun 2021 (final grant issued 3 Aug 2021).
- Work was due to start on 23 Aug 2021, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Cork County Council planning register, as last seen on 2 Jun 2026. Search the council's register
Council register
The council's register shows: Granted on 22 Jun 2021.
Search the Cork planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
New Clinical Manufacturing Facility
A 10 year permission for the construction of a new Clinical Manufacturing Facility (referred to as RCMF) at the existing Pfizer site. The proposed RCMF facility will include (i) a new five storey clinical manufacturing building (c.11,468 m² and maximum height 29.425m) which will include production areas, laboratories, ancillary office space, warehouse, and plant and utility space. The building will be constructed in two sequential phases, Phase 1 comprising c.9,465 m² and Phase 2 comprising c.2,003 m²; (ii) a single storey warehouse drum store building (c.420 m² and maximum height 13.00m); (iii) an external utility yard comprising; a two storey electrical building (c.94 m² and maximum height 11.70m), an emergency generator with flue stack, 1No. liquid nitrogen tank, 2No. evaporators, 3No. bunded chillers, 2No. bunded receiver tanks, 2No. bunded glycol tanks, a three storey steel frame structure (to a maximum height of 12.91m) to accommodate; dry coolers, heat exchangers and other miscellaneous utility plant and machinery above the utility yard; (iv) an elevated structural steel piperack (c.210m in length and maximum height 9.19m) to provide piped utility services to the new facility, and; (v) all associated site development works, including roads, paths, yards, underground services and landscaping. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (P0013-04). As the development refers to a modification to an establishment to which the Major Accident Directive applies, information as specified in the third schedule of the Major Accident Regulations will be submitted with the application. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the Planning Authority with the application.
- Location
- Co. Cork Map
- Council
- Cork County Council
- Planning reference
- 21/5132
Numbers and dates
- Floor area
- 936 m²
- Project type
- Commercial new build
- Received
- 28 Apr 2021
- Decision to grant
- 22 Jun 2021
- Final grant
- 3 Aug 2021
- Site start notified
- 23 Aug 2021
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 21/5132.Search the register
How we know this
From the Cork County Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 23 Aug 2021Notice filed · Pfizer RCMF Project - construction of three new buildings: (1) RCMF Building; (2)...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.