Save this project to account
GrantedDecision recorded

Commercial fit-out, West Cork Distillers Ltd. Fastnet Industrial Estate Marsh...

Skibbereen, Cork · Cork County Council · Plan 24/315 · PB ref PB-10000122199

Permission for the retention of the following as built structures: 1) Additional car parking area comprising of 28 no. car parking spaces and a pedestrian entry/exit gate providing access to the existing public footpath; 2) Change of use from Visitor Centre to Distillery...

Indicative value €500k–1m PB indicative band
Units applied for Not listed public application record
Floor area 813 m² published reliable figure
Decision 4 Mar 2025 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 4 Mar 2025. / Confidence: Low
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

Permission for the retention of the following as built structures: 1) Additional car parking area comprising of 28 no. car parking spaces and a pedestrian entry/exit gate providing access to the existing public footpath; 2) Change of use from Visitor Centre to Distillery (Visitor Centre was conditioned out through condition no. 4, Planning Ref. 19/779); 3) First floor offices and associated staff welfare areas in Distillery building; 4) Distillery stack to the existing Distillery building roof; 5) Distillery...

Ref 24/315 Source-linked Official application description for exact planning reference 24/315
Open scope evidence

Public source roles

No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 1 official source
Authority
Cork County Council
Exact reference
24/315
Evidence reviewed
2 Jun 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Commercial fit-out

Commercial fit-out

The public application record identifies commercial fit-out in the submitted planning scope.

24/315Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
not included in reference feed
Planning agent
not included in reference feed
Official description

Application text

Permission for the retention of the following as built structures: 1) Additional car parking area comprising of 28 no. car parking spaces and a pedestrian entry/exit gate providing access to the existing public footpath; 2) Change of use from Visitor Centre to Distillery (Visitor Centre was conditioned out through condition no. 4, Planning Ref. 19/779); 3) First floor offices and associated staff welfare areas in Distillery building; 4) Distillery stack to the existing Distillery building roof; 5) Distillery spirit bond with a maximum tank height of 12m; 6) Machinery building and associated Electrical Room with extended canopy to side of Machinery building; 7) Grain intake area comprising of 6 no. grain silos and associated gantries; 8) Glan bund 9 with a maximum tank height of 10.76m 9) Glan bund 10 with a maximum tank height of 10.35m and associated gantries; 10) 712cu/m Firefighting water retention tank; 11) Column still and associated gantries; 12) Boiler house and boiler stack; 13) Sump for fire water diversion. Permission is also sought for the construction of the following: 14) New 60 tonne gas tank to replace the existing 30 Tonne gas tank; 15) Grain intake building, approximately 42 m²: 16) Two 40-foot containers for water treatment system 17) Two new Combined Heating & Power plant, 18) New Workshop building, approximately 813 m². The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The proposed development is for the purposes of an activity requiring an Integrated Pollution Prevention and Control License

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 24/315

Permission for the retention of the following as built structures: 1) Additional car parking area comprising of 28 no. car parking spaces and a pedestrian entry/exit gate providing access to the existing public footpath; 2) Change of use from Visitor Centre to Distillery (Visitor Centre was conditioned out through condition no. 4, Planning Ref. 19/779); 3) First floor offices and associated staff welfare areas in Distillery building; 4) Distillery stack to the existing Distillery building roof; 5) Distillery spirit bond with a maximum tank height of 12m; 6) Machinery building and associated Electrical Room with extended canopy to side of Machinery building; 7) Grain intake area comprising of 6 no. grain silos and associated gantries; 8) Glan bund 9 with a maximum tank height of 10.76m 9) Glan bund 10 with a maximum tank height of 10.35m and associated gantries; 10) 712cu/m Firefighting water retention tank; 11) Column still and associated gantries; 12) Boiler house and boiler stack; 13) Sump for fire water diversion. Permission is also sought for the construction of the following: 14) New 60 tonne gas tank to replace the existing 30 Tonne gas tank; 15) Grain intake building, approximately 42 m²: 16) Two 40-foot containers for water treatment system 17) Two new Combined Heating & Power plant, 18) New Workshop building, approximately 813 m². The proposed development is for modifications to an establishment to which the Major Accidents Directive applies. The proposed development is for the purposes of an activity requiring an Integrated Pollution Prevention and Control License

AuthorityCork County Council
Reference24/315
StatusChecked 2 Jun 2026
Open official record