Site start · Co. Cork
Kinsale, Cork
Granted 16 May 2024 (final grant issued 20 Jun 2024)
Key facts
- Site start record 24/4504 at Kinsale, Co. Cork: Amendments to as-permitted development.
- The planning authority is Cork County Council.
- Status: Granted 16 May 2024 (final grant issued 20 Jun 2024).
Source: the Cork County Council planning register, as last seen on 12 Jul 2026. Search the council's register
More planning applications in Kinsale · Planning applications in Co. Cork
Council register
The council's register shows: Granted on 16 May 2024.
Search the Cork planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
Amendments to as-permitted development
Amendments to as-permitted development, located at the northwest corner of the existing IE8 Pharmaceutical Manufacturing Building, will consist of the demolition of the existing entrance and female changing room at ground floor and breakroom offices at mezzanine level, modifications to the existing IE8 building to facilitate the construction of a 5 storey extension (including mezzanine floor) as-permitted under planning register no. 21/6388, to be constructed in two phases with phase 1 complete. The proposed extension will include a range of support accommodation including new entrance, lobby, staff changing areas, WC facilities, canteen, office areas, electrical rooms, new stairs and lift and mechanical/electrical plantrooms areas, including rooftop plant. External works will include: modifications to existing ground levels to facilitate the proposed extension; alterations to existing elevations; modifications to the internal vehicle and pedestrian access roadways and all associated ancillary site development and drainage works. Proposed amendments will include an increase in floor area of the as-permitted extension from ground floor to roof level to extend the ground floor staging area and the provision of AHU plant platforms over, an increase in height of the as-permitted parapet level to accommodate roof plant screened enclosure, minor amendments to internal layouts and amendments to the external facades including revised fenestration designs. The development will be located on a site that currently operates under an Industrial Emissions (IE) License (P0009-04) under Part IV of the Environmental Protection Agency Act of 1992 (as amended for the protection of the Environment act 2003). The new development is on a site to which Chemicals Act (Control of Major Accidents Hazards involving Dangerous Substances) Regulations 2015 (S.I.209 of 2015) applies.
- Location
- Kinsale, Co. Cork Map
- Council
- Cork County Council
- Planning reference
- 24/4504
- Application type
- Commencement Notice
- Agent named on the notice
- Vision Contracting Ltd
Numbers and dates
- Floor area
- 1,125 m²
- Project type
- Commercial fit-out
- Received
- 22 Mar 2024
- Decision to grant
- 16 May 2024
- Final grant
- 20 Jun 2024
- Site start notified
- 18 Nov 2024
Site history
This site's history
-
Earlier permission 21/6388 for this site: granted 20 Oct 2021.
The proposed two-phase development located at the north-west corner of the existing IE08 pharmaceutical manufacturing and production… Named in this application's description -
Site start under planning reference 19/6029, about 20 m away: commencement notice filed.
IE2b Expansion Project at ELi Lilly - A Pharmaceutical Manufacturing Building Extension to the Existing IE2 Building over 3 floors with… About 20 m away -
Site start under planning reference 25/04382, about 10 m away: commencement notice filed.
Expansion to the Existing Wastewater Treatment Plant, that includes Three number buildings consisting of a single storey Precipitation… About 10 m away -
Site start under planning reference 244047 at the same map point: commencement notice filed.
The development consists of the construction of a prefabricated server building (Server Room No.1) within the pharmaceutical site, with a… Same map point -
Site start under planning reference 23/06059 at the same map point: commencement notice filed.
Construction of a new 3 Storey Administration Extension with Mezzanine Floor between each level to Existing IE2b Production Building and… Same map point -
Site start under planning reference 17/06712 at the same map point: commencement notice filed.
Demolition of existing LC-5 Electrical Load Centre and construction of new Electrical Load Centre Building at the same location Same map point -
Site start under planning reference 20/04460 at the same map point: commencement notice filed.
Single storey extension to existing load centre 6 and associated site works. Same map point -
Site start under planning reference 216812 at the same map point: commencement notice filed.
Construction of a 3 Storey Extension to Existing IE2b Production Building (gross floor area = 1520m2) & Material Alteration to Fallow Area… Same map point
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 24/4504.Search the register
How we know this
From the Cork County Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 18 Nov 2024Notice filed · Material Alterations and 6 Storey Extension to an Existing Production BuildingView the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.