Agricultural · Co. Cork
Boston Scientific Ireland Ltd, Cork Business and, Technology Park
Granted 25 Feb 2025
Key facts
- Planning application 2442971 at Boston Scientific Ireland Ltd, Cork Business And, Technology Park: Modifications to the existing manufacturing building.
- It was received by Cork City Council on 29 May 2024.
- Status: Granted 25 Feb 2025.
- Work started on site on 12 May 2025, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Cork City Council planning register, checked 2 Jun 2026. Open the council's file
Since you last looked
Worked out in this browser from the record's own dates. We do not send emails about it.
What and where
Modifications to the existing manufacturing building
Permission for modifications to the existing manufacturing building and all ancillary site development works at the Cork Business and Technology Park, Model Farm Road, Cork, T12DH66. The proposed development consists of modifications to the existing building that include: (1) The construction of an extension to the building with roof access stairs, (2) Internal modifications to the layout resulting in the creation of additional floor area at 5 corners of the building at ground and mezzanine levels, (3) An extension of the mezzanine level, (4) The installation of roof lights; (5) Roof access stairs to the existing roof; (6) New loading bay; and (7) New external doors at ground floor level. The proposed site development works include the construction of: A) A pallet shed; (B) A sprinkler pump house; (C) 2 no. fire water tanks; (D) A new waste yard; (E) A chemical store; (F) Removal and replacement of two existing retaining walls; (G) Perimeter fencing; (H) A bike store. The site is within the curtilage of a protected structure, the Former Munster Institute (PS637).
- Location
- Technology Park, Co. Cork Map
- Council
- Cork City Council
- Planning reference
- 2442971
Numbers and dates
- Project type
- Agricultural
- Received
- 29 May 2024
- Granted
- 25 Feb 2025
- Site start
- 12 May 2025
- Protected structure
- Yes
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 2442971 on planning.corkcity.ie: drawings, reports and the decision.Open the council's file
How we know this
From the Cork City Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.
Site starts
Commencement notices for this permission
- 12 May 2025Work started · phase 1 · 5711 - Boston Scientific Building 02 - Material alteration and extension of existing...
- 13 Jul 2026Work started · phase 2 · Installation of prefabricated chemical storerooms
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.