Small residential · Co. Cork
Ballynaclashy Ballyrichard Beg Curragh and Lysaghtstown Co. Cork
Granted 30 Oct 2025
Key facts
- Planning application 25/5141 at Ballynaclashy Ballyrichard Beg Curragh and Lysaghtstown Co. Cork: ~2 homes.
- It was received by Cork County Council on 16 Jun 2025.
- Status: Granted 30 Oct 2025.
- Permission was granted on 30 Oct 2025 and no site start has been filed yet. The next step is a commencement notice, filed before building work begins; the start date and who will build it are not known yet.
Source: the Cork County Council planning register, checked 2 Jun 2026. Open the council's file
Since you last looked
Worked out in this browser from the record's own dates.
What and where
~2 homes
Permission for a 10 year planning permission for the proposed development of an underground electricity interconnector cable will comprise of a 33kV double circuit underground cable route, of c.4.3km in length which is to be installed in an excavated trench including underground ducting, joint bays, horizontal directional drills (HDD), communication chambers and all associated site development and reinstatement works. The interconnector cable will extend from two newly proposed ring main units at the permitted Ballynaclashy Solar Farm to a substation at the permitted Lysaghtstown Solar Farm. The proposed development provides for a revision to part of the approved layout of the Ballynaclashy Solar Farm previously permitted under Cork County Council Planning Reference 21/4050 / An Bord Pleanála Reference ABP 311238-21. The revision to the layout comprises the installation of 2 no. ring main units and the laying of the underground electricity interconnector cable. The proposed development also provides for a revision to part of the approved layout of Lysaghtstown Solar Farm as previously permitted under Cork County Council Planning Reference 18/6769 (as amended by references 20/6891 and 21/5089). The revision to this layout comprises the laying of the underground electricity interconnector cable to a substation permitted under An Bord Pleanála Reference ABP 308979-20. The development will be carried out within a combination of the above referenced permitted solar farm boundaries, on private lands and within the L-7634, L-36172, L-7694 and R626 public roads. The underground electricity interconnector cable will be routed around Tomasheen Bridge through private lands via HDD. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application.
- Location
- Co. Cork Map
- Council
- Cork County Council
- Planning reference
- 25/5141
Numbers and dates
- Homes
- ~2estimated from the application
- Estimated construction value
- €290k to €440kOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Small residential
- Received
- 16 Jun 2025
- Granted
- 30 Oct 2025
Timeline
- Application received
- Granted
- Appeal lodged
- Appeal decidedGrant permission
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning fileThe application file 25/5141 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file
- AppealGrant permission · 500343 / 5 Jun 2026View the appeal record
How we know this
From the Cork County Council planning register, checked 2 Jun 2026. We link to the council's own file so you can check the official record before you act.