Temporary/event, Kilshinahan, Timoleague, Co. Cork
A c.5MW solar farm comprising approximately 14,000 photovoltaic panels on ground mounted frames, 1 no. single storey transformer station (15 m²), 1 no. single storey delivery station (53 m²), 2 no. single storey spare parts storage containers (15 m² each), security fencing, CCTV, landscaping and all other ancillary development...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 19 Feb 2026. / Confidence: LowDecision date 19 Feb 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
A c.5MW solar farm comprising approximately 14,000 photovoltaic panels on ground mounted frames, 1 no. single storey transformer station (15 m²), 1 no. single storey delivery station (53 m²), 2 no. single storey spare parts storage containers (15 m² each), security fencing, CCTV, landscaping and all other ancillary development works. The solar panels will be arranged within a developable area of approximately 8.6 ha at Kilshinahan, Timoleague, Co. Cork. The proposed development will consist of the construction...
Open scope evidenceNamed firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Confidence & provenance 1 official source
- Authority
- Cork County Council
- Exact reference
- 25/6532
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Temporary/event
The public application record identifies temporary/event in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Cork planning activity
These are county discovery links, not claimed relationships to this application.
Application text
A c.5MW solar farm comprising approximately 14,000 photovoltaic panels on ground mounted frames, 1 no. single storey transformer station (15 m²), 1 no. single storey delivery station (53 m²), 2 no. single storey spare parts storage containers (15 m² each), security fencing, CCTV, landscaping and all other ancillary development works. The solar panels will be arranged within a developable area of approximately 8.6 ha at Kilshinahan, Timoleague, Co. Cork. The proposed development will consist of the construction and completion of the solar farm as permitted by and commenced under Planning Permission Ref. 15/6968, extended by Ref. 21/4496 and modified by Ref. 22/6452, with proposed minor changes to that which was permitted to the site layout, as shown in the permitted site layout drawings (Drawing Ref. No.s 4332_2005_A, 4332_2006_A and 4332_2007_A), including array arrangement and internal track route, and minor changes to the fence alignment along the north west boundary; and the addition of a second single storey spare parts storage container (15 m²) (2 no. single storey spare parts storage containers in total). It is anticipated that works under the extant planning permissions will commence with the approved site clearance works, access roads and temporary internal tracks/roads, fencing and gates, and the proposed development will incorporate those works and such further construction and completion of the solar farm as modified by the proposed grant of planning permission the subject of this application. A 2-year permission is sought, with works expected to commence in Q1 2026 under the extant permissions and this permission is sought to secure the completion of the solar farm development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Application to site progress
-
Applied 20 Nov 2025 25/6532
-
Decision Grant with Conditions 19 Feb 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 25/6532
A c.5MW solar farm comprising approximately 14,000 photovoltaic panels on ground mounted frames, 1 no. single storey transformer station (15 m²), 1 no. single storey delivery station (53 m²), 2 no. single storey spare parts storage containers (15 m² each), security fencing, CCTV, landscaping and all other ancillary development works. The solar panels will be arranged within a developable area of approximately 8.6 ha at Kilshinahan, Timoleague, Co. Cork. The proposed development will consist of the construction and completion of the solar farm as permitted by and commenced under Planning Permission Ref. 15/6968, extended by Ref. 21/4496 and modified by Ref. 22/6452, with proposed minor changes to that which was permitted to the site layout, as shown in the permitted site layout drawings (Drawing Ref. No.s 4332_2005_A, 4332_2006_A and 4332_2007_A), including array arrangement and internal track route, and minor changes to the fence alignment along the north west boundary; and the addition of a second single storey spare parts storage container (15 m²) (2 no. single storey spare parts storage containers in total). It is anticipated that works under the extant planning permissions will commence with the approved site clearance works, access roads and temporary internal tracks/roads, fencing and gates, and the proposed development will incorporate those works and such further construction and completion of the solar farm as modified by the proposed grant of planning permission the subject of this application. A 2-year permission is sought, with works expected to commence in Q1 2026 under the extant permissions and this permission is sought to secure the completion of the solar farm development. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
Open official record