Commercial new build, Scarteen Lower, Newmarket, Co. Cork.

Newmarket, Cork · Cork County Council · Plan 26/1438 · PB ref PB-2200571248

(1) construction of an extension to the existing whey process building, (2) construction of a new electrical switchroom, (3) construction of a new concrete plinth and installation of two no. 120m³ whey product storage silos, and (4) all associated site development and ancillary works. The application relates to a facility...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 15 Sep 2026 public planning date
Commenced None indexed public commencement index
Decision-stage scope

The public decision state is shown, but conditions and later amendments can still change delivery scope.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

Decision date 15 Sep 2026. / Confidence: Low
Decision Grant with Conditions

Decision date 15 Sep 2026.

Open evidence
Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

(1) construction of an extension to the existing whey process building, (2) construction of a new electrical switchroom, (3) construction of a new concrete plinth and installation of two no. 120m³ whey product storage silos, and (4) all associated site development and ancillary works. The application relates to a facility which is licensed by the Environmental Protection Agency under an Industrial Emissions (IE) Licence

Ref 26/1438 Source-linked Official application description for exact planning reference 26/1438
Open scope evidence

Public source roles

Newmarket Co-Operative Creameries Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 1 official source
Authority
Cork County Council
Exact reference
26/1438
Evidence reviewed
26 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Commercial new build

Commercial new build

The public application record identifies commercial new build in the submitted planning scope.

26/1438Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Newmarket Co-Operative Creameries Ltd
Planning agent
Lynch Consulting Engineers

Reviewed build intelligence

What the documents establish

Government document review

Decision recorded; appeal window open and no exact commencement link. Scale reflects the permitted decision record.

8 official documents inspected · Checked 2026-09-19 · Official file index

Treatment systems

Application record · Cork County Council 26/1438 official inventory date 2026-05-29: application scheme as submitted or assessed at that date, evidenced by Appropriate Assessment Screening Report, Engineering Report, Environmental Impact Assessment Screening Report, Environmental Report; any later dated revision is a separate state.

What the evidence says
wastewater treatment infrastructure

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Engineering Report · p.5
Page 5 · Issued 2026-05-29 · Cork County Council 26/1438 - Engineering Report (planner_report); official inventory date 2026-05-29; retained revision sha256:8872da0de771 · Checked 2026-09-19

wastewater treatment infrastructure

Service yards

Application record · Cork County Council 26/1438 official inventory date 2026-05-29: application scheme as submitted or assessed at that date, evidenced by Appropriate Assessment Screening Report, Engineering Report, Environmental Impact Assessment Screening Report, Environmental Report; any later dated revision is a separate state.

What the evidence says
service yards

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Engineering Report · p.5
Page 5 · Issued 2026-05-29 · Cork County Council 26/1438 - Engineering Report (planner_report); official inventory date 2026-05-29; retained revision sha256:8872da0de771 · Checked 2026-09-19

service yards

Gross floor area

Application record · Cork County Council 26/1438 official inventory date 2026-05-29: application scheme as submitted or assessed at that date, evidenced by Appropriate Assessment Screening Report, Engineering Report, Environmental Impact Assessment Screening Report, Environmental Report; any later dated revision is a separate state.

What the evidence says
242 m²

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Environmental Impact Assessment Screening Report · p.11
Page 11 · Issued 2026-05-29 · Cork County Council 26/1438 - Environmental Impact Assessment Screening Report (planner_report); official inventory date 2026-05-29; retained revision sha256:226c5a7bc357 · Checked 2026-09-19

242 m2

Site area

Application record · Cork County Council 26/1438 official inventory date 2026-05-29: application scheme as submitted or assessed at that date, evidenced by Appropriate Assessment Screening Report, Engineering Report, Environmental Impact Assessment Screening Report, Environmental Report; any later dated revision is a separate state.

What the evidence says
4.3 ha

Machine-extracted from the official document; automated reviewed for publication.

Why it may matter — interpretation
Exact official wording retained for any downstream trade or planning lens to read without re-extracting the documents.

What is not established
Machine-extracted and automated reviewed; later revisions, conditions, approvals and construction outcomes are not established.

Inspect the evidence

Environmental Report · p.5
Page 5 · Issued 2026-05-29 · Cork County Council 26/1438 - Environmental Report (planner_report); official inventory date 2026-05-29; retained revision sha256:32f0003a8824 · Checked 2026-09-19

approximately 4.3 hectares
Remaining document questions
  • Inspect any later revision the authority replaces at the same URL.
  • Link the commencement and completion events when they arrive.

8 retained official PDF revision(s) from the exact Cork County Council 26/1438 file list. Machine extraction reads bounded passages; drawings are not interpreted.

Official description

Application text

(1) construction of an extension to the existing whey process building, (2) construction of a new electrical switchroom, (3) construction of a new concrete plinth and installation of two no. 120m³ whey product storage silos, and (4) all associated site development and ancillary works. The application relates to a facility which is licensed by the Environmental Protection Agency under an Industrial Emissions (IE) Licence

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal indexed No public appeal record is indexed against this application.
CommencementPublic commencement index
  1. Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 26/1438

(1) construction of an extension to the existing whey process building, (2) construction of a new electrical switchroom, (3) construction of a new concrete plinth and installation of two no. 120m³ whey product storage silos, and (4) all associated site development and ancillary works. The application relates to a facility which is licensed by the Environmental Protection Agency under an Industrial Emissions (IE) Licence

AuthorityCork County Council
Reference26/1438
StatusChecked 26 Sep 2026
Open official record