Infrastructure · Co. Cork

Development, Co. Cork

Archived record: last seen in the register on 22 Jun 2026

Archived record

This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 22 Jun 2026. The details below are as they were then. The council's register has the current status.

What and where

Development

Permission for development at a site at lands at Tivoli Docks, part of the N8 at the existing Silversprings interchange access to Tivoli Docks, and part of the N8 to both the east and west of the Dunkettle/Glanmire roundabout), part of the R635 (North Ring Road) from the N8 to Silversprings Lane, the Dunkettle/Glanmire roundabout, part of Lota Brothers of Charity, and part of the R639 Glanmire Road all at Tivoli, Cork. Permission is sought for a 10 year duration. The development will consist of multi-modal (vehicular, bus and active travel) transport access enabling infrastructure comprising two access points to Tivoli Docks. One access will comprise a new grade separated multi-modal junction over the N8 dual carriageway and the Cork to Cobh/Midelton railway line to provide access into the eastern part of the Tivoli Docks and revised N8 junction arrangements with the R639 Glanmire Road, which will include the replacement of the existing Dunkettle roundabout (also known as the Glanmire Roundabout), new ramp connections and traffic signals between the N8 and the R639 Glanmire Road and Tivoli Docks, revisions to the existing N8 access and egress points to the Lota Brothers of Charity lands, and provision of a new additional one-way access to the Lota Brothers of Charity (which is a protected structure), involving the removal of part of a boundary wall. The second access will comprise a multi-modal upgrade of the existing N8 interchange at Silversprings including the existing entrance into Tivoli Docks to provide new access arrangements into Tivoli Docks and to provide new traffic signals and lane configurations at the northern side of the Silversprings interchange at the R635 North Ring Road. The proposed development will provide for multi-modal access at both access points and connections to existing and proposed active travel routes, landscaping works, surface water drainage, directional road signage, public lighting and all associated site development works, all on a site of 17.7 ha. An Environmental Impact Assessment Report and a Natura Impact Assessment have been prepared for the proposed development and form part of the application.

Location
Co. Cork Map
Planning reference
26/44589
Applicant
Port of Cork Company
Agent
Maria Lombard

Key facts

Project type
Infrastructure
Received
12 Mar 2026
Protected structure
Yes

Outlook

What happens next

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning fileThe application file 26/44589 on planning.agileapplications.ie: drawings, reports and the decision.Open the council's file

How we know this

From the Cork City Council planning register, as last seen on 22 Jun 2026. The council's own file is the official record.

Explore the area

More planning activity near Co. Cork

Get alerts for Co. CorkFree. We email you when new applications appear.

Free email alerts

Get new Cork projects by email

New planning applications, decisions and site starts in Co. Cork. We only email when something new appears.

How often

We send a confirmation link first. No alerts until you click it.

Follow this applicationMore alert options