Infrastructure, RAILWAY ROAD, STRANORLAR, LIFFORD PO
COMPLETION OF THE PARTIALLY CONSTRUCTED FOOTBALL STADIUM (APPROXIMATELY 5580 TOTAL SPECTATOR CAPACITY), PREVIOUSLY APPROVED UNDER THE NOW-LAPSED PLANNING PERMISSION REF. NO. 05/9008. THE COMPLETED STADIUM WILL CONSIST OF 4 NO. STANDS IN A CLOSED-BOWL CONFIGURATION (WITH THE WEST STAND ALREADY PARTIALLY CONSTRUCTED) AND WILL...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 19 Dec 2025. / Confidence: LowDecision date 19 Dec 2025.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
COMPLETION OF THE PARTIALLY CONSTRUCTED FOOTBALL STADIUM (APPROXIMATELY 5580 TOTAL SPECTATOR CAPACITY), PREVIOUSLY APPROVED UNDER THE NOW-LAPSED PLANNING PERMISSION REF. NO. 05/9008. THE COMPLETED STADIUM WILL CONSIST OF 4 NO. STANDS IN A CLOSED-BOWL CONFIGURATION (WITH THE WEST STAND ALREADY PARTIALLY CONSTRUCTED) AND WILL INCLUDE THE FOLLOWING: (1) WEST STAND WHICH WILL CONSIST OF THE EXISTING PRECAST CONCRETE TERRACE, PROVIDING SEATING FOR APPROXIMATELY 2,100 SPECTATORS, ALONG WITH AN ANCILLARY ACCOMMODATION...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Donegal County Council
- Exact reference
- 2462022
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Infrastructure
The public application record identifies infrastructure in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- not included in reference feed
- Planning agent
- not included in reference feed
More Donegal planning activity
These are county discovery links, not claimed relationships to this application.
Application text
COMPLETION OF THE PARTIALLY CONSTRUCTED FOOTBALL STADIUM (APPROXIMATELY 5580 TOTAL SPECTATOR CAPACITY), PREVIOUSLY APPROVED UNDER THE NOW-LAPSED PLANNING PERMISSION REF. NO. 05/9008. THE COMPLETED STADIUM WILL CONSIST OF 4 NO. STANDS IN A CLOSED-BOWL CONFIGURATION (WITH THE WEST STAND ALREADY PARTIALLY CONSTRUCTED) AND WILL INCLUDE THE FOLLOWING: (1) WEST STAND WHICH WILL CONSIST OF THE EXISTING PRECAST CONCRETE TERRACE, PROVIDING SEATING FOR APPROXIMATELY 2,100 SPECTATORS, ALONG WITH AN ANCILLARY ACCOMMODATION BUILDING WHICH WILL INCLUDE CHANGING FACILITIES, PUBLIC AND STAFF TOILETS, A GYMNASIUM, TREATMENT ROOMS, OFFICES, STORAGE, AND PLANT AT GROUND FLOOR LEVEL (PARTIALLY UNDER THE RAKED TERRACES) WITH MULTIPURPOSE ROOMS, LICENSED CORPORATE BOXES SUITES, MEETING SPACES, TRAINING ROOMS, CLUB ROOMS, A CONTROL ROOM, MEDIA ROOMS, AND OFFICES AT FIRST AND SECOND FLOOR LEVELS ABOVE. THIS WILL INVOLVE THE RENOVATION AND PART DEMOLITION OF THE EXISTING PARTIALLY COMPLETED ANCILLARY ACCOMMODATION BLOCK, (2) EAST STAND FEATURING A NEWLY CONSTRUCTED SPECTATOR TERRACE WITH SEATING FOR APPROXIMATELY 1,230 SPECTATORS, ALONG WITH A NEW AMENITY BUILDING WHICH WILL HOUSE A GYMNASIUM, TREATMENT ROOM, TOILETS, CHANGING FACILITIES, AND AN OFFICE AT GROUND FLOOR LEVEL WITH THE PROVISION OF A HOSPITALITY AREA TO FIRST FLOOR LEVEL AND A TV GANTRY LOCATED AT ROOF LEVEL AS WELL AS 2 NO. DETACHED, EXTERNALLY ACCESSED PUBLIC TOILET BLOCKS, (3) NORTH AND SOUTH STANDS WHICH WILL INCLUDE NEWLY CONSTRUCTED SPECTATOR TERRACES, EACH WITH SEATING FOR APPROXIMATELY 240 SPECTATORS AND ADDITIONAL STANDING CAPACITY FOR CIRCA 885 SPECTATORS EACH, (4) COMPLETION OF THE GRASS PLAYING PITCH FORMATION WITH STORM DRAINAGE AND GOALS, FLAGS, LINING FENCING RAILS AND NORMAL SOCCER ACCESSORIES AND (5) SITE DEVELOPMENT WORKS WHICH WILL INCLUDE THE PROVISION OF CAR PARKING, BUS PARKING, SEGREGATED PEDESTRIAN ROUTES, TURNSTILES, 4 NO. 1200 LUX FLOODLIGHTS (APPROXIMATELY 40 METERS TALL), AN ESB SUBSTATION, AND ASSOCIATED SITE WORKS, INCLUDING COMPLETION OF DRAINAGE, BOTH HARD AND SOFT LANDSCAPING, GATES, ACCESS CONTROL AND SITE BOUNDARY FENCING
Application to site progress
-
Applied 9 Dec 2024 2462022
-
Decision Conditional 19 Dec 2025
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2462022
COMPLETION OF THE PARTIALLY CONSTRUCTED FOOTBALL STADIUM (APPROXIMATELY 5580 TOTAL SPECTATOR CAPACITY), PREVIOUSLY APPROVED UNDER THE NOW-LAPSED PLANNING PERMISSION REF. NO. 05/9008. THE COMPLETED STADIUM WILL CONSIST OF 4 NO. STANDS IN A CLOSED-BOWL CONFIGURATION (WITH THE WEST STAND ALREADY PARTIALLY CONSTRUCTED) AND WILL INCLUDE THE FOLLOWING: (1) WEST STAND WHICH WILL CONSIST OF THE EXISTING PRECAST CONCRETE TERRACE, PROVIDING SEATING FOR APPROXIMATELY 2,100 SPECTATORS, ALONG WITH AN ANCILLARY ACCOMMODATION BUILDING WHICH WILL INCLUDE CHANGING FACILITIES, PUBLIC AND STAFF TOILETS, A GYMNASIUM, TREATMENT ROOMS, OFFICES, STORAGE, AND PLANT AT GROUND FLOOR LEVEL (PARTIALLY UNDER THE RAKED TERRACES) WITH MULTIPURPOSE ROOMS, LICENSED CORPORATE BOXES SUITES, MEETING SPACES, TRAINING ROOMS, CLUB ROOMS, A CONTROL ROOM, MEDIA ROOMS, AND OFFICES AT FIRST AND SECOND FLOOR LEVELS ABOVE. THIS WILL INVOLVE THE RENOVATION AND PART DEMOLITION OF THE EXISTING PARTIALLY COMPLETED ANCILLARY ACCOMMODATION BLOCK, (2) EAST STAND FEATURING A NEWLY CONSTRUCTED SPECTATOR TERRACE WITH SEATING FOR APPROXIMATELY 1,230 SPECTATORS, ALONG WITH A NEW AMENITY BUILDING WHICH WILL HOUSE A GYMNASIUM, TREATMENT ROOM, TOILETS, CHANGING FACILITIES, AND AN OFFICE AT GROUND FLOOR LEVEL WITH THE PROVISION OF A HOSPITALITY AREA TO FIRST FLOOR LEVEL AND A TV GANTRY LOCATED AT ROOF LEVEL AS WELL AS 2 NO. DETACHED, EXTERNALLY ACCESSED PUBLIC TOILET BLOCKS, (3) NORTH AND SOUTH STANDS WHICH WILL INCLUDE NEWLY CONSTRUCTED SPECTATOR TERRACES, EACH WITH SEATING FOR APPROXIMATELY 240 SPECTATORS AND ADDITIONAL STANDING CAPACITY FOR CIRCA 885 SPECTATORS EACH, (4) COMPLETION OF THE GRASS PLAYING PITCH FORMATION WITH STORM DRAINAGE AND GOALS, FLAGS, LINING FENCING RAILS AND NORMAL SOCCER ACCESSORIES AND (5) SITE DEVELOPMENT WORKS WHICH WILL INCLUDE THE PROVISION OF CAR PARKING, BUS PARKING, SEGREGATED PEDESTRIAN ROUTES, TURNSTILES, 4 NO. 1200 LUX FLOODLIGHTS (APPROXIMATELY 40 METERS TALL), AN ESB SUBSTATION, AND ASSOCIATED SITE WORKS, INCLUDING COMPLETION OF DRAINAGE, BOTH HARD AND SOFT LANDSCAPING, GATES, ACCESS CONTROL AND SITE BOUNDARY FENCING
Open official record