Development Description
DEMOLITION OF EXISTING DWELLING HOUSE CONSTRUCTED WITH DEFECTIVE CONCRETE BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE INCORPORATING A SELF-CONTAINED RESIDENTIAL ANNEX AND ASSOCIATED SITE DEVELOPMENT WORKS
Donegal County Council / 2561895
DEMOLITION OF EXISTING DWELLING HOUSE CONSTRUCTED WITH DEFECTIVE CONCRETE BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE INCORPORATING A...
DEMOLITION OF EXISTING DWELLING HOUSE CONSTRUCTED WITH DEFECTIVE CONCRETE BLOCKWORK AND CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE INCORPORATING A SELF-CONTAINED RESIDENTIAL ANNEX AND ASSOCIATED SITE DEVELOPMENT WORKS
Project lifecycle links
Lifecycle matches are best-effort and source-linked. Tender matches are shown only where the buyer or location match is conservative; verify before acting.
Donegal County Council
Contextual resources
See this authority's related leads, appeals, tenders and historical commencements.
Rough-check planning application fees before quoting or filing.
Estimate contribution exposure and verify the local authority scheme.
Understand the notice stage before a granted project moves toward site.
Safety statement, RAMS, AF notices, training cards and site templates.
Useful when this lead implies contractor, PSCS or site-safety demand.
Check survey and pre-works duties before demolition or refurbishment.
Browse ACP and planning appeal records for professional follow-up.
Same county
(1) DEMOLITION OF EXISTING DERELICT DWELLING AND (2) CONSTRUCTION OF A REPLACEMENT DWELLING HOUSE WITH SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS. A NATURA IMPACT STATMENT (NIS) ACCOMPANIES THIS APPLICATION
COMPLETION OF WORKS TO WHICH PLANNING PERMISSION REF. NOS. 06/70031 & 11/70083 REFER CONSISTING OF THE COMPLETION OF HOUSE NOS. 23-35 INCLUSIVE (13 NO. IN TOTAL), AND CARRYING OUT REPAIRS TO THE EXISTING ONSITE TREATMENT SYSTEM WITH CONNECTION TO EXISTI...
DEMOLITION OF EXISTING DWELLING DUE TO DEFECTIVE MICA BLOCKWORK AND ERECTION OF A REPLACEMENT DWELLING WITH CONNECTION TO EXISTING SERVICES AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN ELECTRICITY STORAGE FACILITY COMPRISING OF A BATTERY ENERGY STORAGE SYSTEM (BESS), WITHIN A TOTAL SITE AREA OF UP TO 6.1HA TO INCLUDE ONE ELECTRICAL COMPOUNT, ELECTRICAL TRANSFORMER/INVERTER STATION MODULES, BATTERY STORAGE ENCLOSURES (BS...
DEMOLITION OF EXISTING DERELICT DWELLING AND CONSTRUCTION OF A NEW REPLACEMENT DWELLING HOUSE WITH NEW SEWAGE TREATMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS