Development Description
(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), DOMESTIC OFFICE AND HOME GYM (49.1M2), WITH A CURTILAGE, GRAVELLED AREA (152.6M2). THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2, (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN INCLUDE AN OIL FILTER AND PREVENTION OF WATER ENTERING THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND. MAINS WATER IS AVAILABLE ON SITE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
Map
No coordinates supplied in the public planning feed.