Temporary/event, CARRONTLIEVE CARROWMULLIN FIGARY, LISFANNAN LUDDAN &...
A TEN-YEAR PLANNING PERMISSION FOR DEVELOPMENT AT THE EXISTING BUNCRANA WASTEWATER TREATMENT PLANT (WWTP) LOCATED AT RAILWAY ROAD, BALLYMACARRY LOWER, CO. DONEGAL; THE EXISTING FAHAN WWTP LOCATED AT CARRONTLIEVE, FAHAN, CO. DONEGAL; AND ALONG THE R238 REGIONAL ROAD WITHIN THE TOWNLANDS OF CARRONTLIEVE, CARROWMULLIN, FIGARY...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 12 Feb 2026. / Confidence: LowDecision date 12 Feb 2026.
No commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
A TEN-YEAR PLANNING PERMISSION FOR DEVELOPMENT AT THE EXISTING BUNCRANA WASTEWATER TREATMENT PLANT (WWTP) LOCATED AT RAILWAY ROAD, BALLYMACARRY LOWER, CO. DONEGAL; THE EXISTING FAHAN WWTP LOCATED AT CARRONTLIEVE, FAHAN, CO. DONEGAL; AND ALONG THE R238 REGIONAL ROAD WITHIN THE TOWNLANDS OF CARRONTLIEVE, CARROWMULLIN, FIGARY, LISFANNAN, LUDDAN, AND BALLYMACARRY LOWER. THE PROPOSED DEVELOPMENT WILL CONSIST OF: (1) UPGRADE WORKS TO THE EXISTING BUNCRANA WWTP REQUIRING AN EXPANSION OF THE EXISTING SITE TO INCREASE ITS...
Named firms
Public source roles
No named firm role is published in this panel's source contract. PlanningBrief does not infer a contractor or supplier.
Evidence-backed work packages
Explicit source signals only
No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.
Confidence & provenance 0 official sources
- Authority
- Donegal County Council
- Exact reference
- 2562206
- Evidence reviewed
- 2 Jun 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Temporary/event
The public application record identifies temporary/event in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Services / drainage scope
The public application description explicitly references services / drainage scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Uisce Éireann
- Planning agent
- Care of Jacques Bessinger
- Agent address
- 1 GALWAY BUSINESS PARK DANGAN GALWAY H91 A3EF
More Donegal planning activity
These are county discovery links, not claimed relationships to this application.
Application text
A TEN-YEAR PLANNING PERMISSION FOR DEVELOPMENT AT THE EXISTING BUNCRANA WASTEWATER TREATMENT PLANT (WWTP) LOCATED AT RAILWAY ROAD, BALLYMACARRY LOWER, CO. DONEGAL; THE EXISTING FAHAN WWTP LOCATED AT CARRONTLIEVE, FAHAN, CO. DONEGAL; AND ALONG THE R238 REGIONAL ROAD WITHIN THE TOWNLANDS OF CARRONTLIEVE, CARROWMULLIN, FIGARY, LISFANNAN, LUDDAN, AND BALLYMACARRY LOWER. THE PROPOSED DEVELOPMENT WILL CONSIST OF: (1) UPGRADE WORKS TO THE EXISTING BUNCRANA WWTP REQUIRING AN EXPANSION OF THE EXISTING SITE TO INCREASE ITS DESIGN POPULATION EQUIVALENT (PE) FROM 13,200PE TO 17,700PE COMPRISING (A) CONSTRUCTION OF A SECONDARY TREATMENT TANK, BLOWERS AND SOUND ATTENUATION BARRIER, PUMP SUMP AND VENT STACK, FLOW METER CHAMBER, VALVE CHAMBER, ADMINISTRATION BUILDING, FLOOD PROTECTION WALL, 2 NO. PICKET FENCE THICKENER TANKS, A SITE DRAINAGE PUMPING STATION, INTERNAL SITE ACCESS ROAD, INTERCONNECTING PIPEWORK AND MANHOLES AND 4 NO. PARKING SPACES, (B) INTERNAL UPGRADES TO THE INLET WORKS BUILDING, INTERNAL UPGRADES TO THE CONTROL AND SLUDGE DEWATERING BUILDING, INTERNAL UPGRADES TO THE OUTFALL PUMPING STATION, REPURPOSING OF THE PRIMARY SETTLEMENT TANKS AS FINAL EFFLUENT BALANCING TANKS, RECONFIGURATION OF THE FLOW DISTRIBUTION CHAMBER AND INTERNAL UPGRADES TO THE SLUDGE HOLDING TANK, (C) REPLACEMENT OF THE EXISTING SITE ACCESS GATE WITH A PALISADE SECURITY GATE, (D) INSTALLATION OF ROOF MOUNTED SOLAR PHOTOVOLTAIC (PV) PANELS ON SOUTH FACING ROOFS OF THE EXISTING INLET WORKS, CONTROL AND SLUDGE DEWATERING AND PROPOSED ADMINISTRATION BUILDINGS, (E) DECOMMISSIONING AND DEMOLITION OF THE EXISTING SITE DRAINAGE PUMPING STATION, GAS HOLDING TANK, PICKET FENCE THICKENER AND SLUDGE DIGESTION TANK AND (F) ALL HARD AND SOFT LANDSCAPING WORKS INCLUDING SCREEN PLANTING AND ALL ASSOCIATED ANCILLARY WORKS INCLUDING SITE WORKS AND TEMPORARY WORKING AREAS, (2) UPGRADE WORKS TO THE EXISTING FAHAN WWTP TO CONVERT IT INTO A WASTEWATER PUMPING STATION (WWPS) COMPRISING (A) CONSTRUCTION OF A STORMWATER HOLDING TANK, PUMP SUMP AND VENT STACK, VALVE CHAMBER, INLET FLUME, SURGE VESSEL, WET KIOSK, 2 NO. CONTROL KIOSKS, CHEMICAL SKID, BUNDED CHEMICAL STORAGE TANK, EMERGENCY SHOWER, WELFARE UNIT, FLOOD PROTECTION WALL WITH GATE, INTERCONNECTING PIPEWORK AND MANHOLES, (B) DECOMMISSIONING AND DEMOLITION OF THE SITE GATE AND WING WALLS, SEPTIC TANK AND PRELIMINARY EQUIPMENT, (C) MATERIAL ALTERATION OF THE EXISTING SITE ACCESS TO INCORPORATE A NEW AND REALIGNED SECURITY MESH SITE GATE AND WINGWALLS AN
Application to site progress
-
Applied 11 Dec 2025 2562206
-
Decision Conditional 12 Feb 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2562206
A TEN-YEAR PLANNING PERMISSION FOR DEVELOPMENT AT THE EXISTING BUNCRANA WASTEWATER TREATMENT PLANT (WWTP) LOCATED AT RAILWAY ROAD, BALLYMACARRY LOWER, CO. DONEGAL; THE EXISTING FAHAN WWTP LOCATED AT CARRONTLIEVE, FAHAN, CO. DONEGAL; AND ALONG THE R238 REGIONAL ROAD WITHIN THE TOWNLANDS OF CARRONTLIEVE, CARROWMULLIN, FIGARY, LISFANNAN, LUDDAN, AND BALLYMACARRY LOWER. THE PROPOSED DEVELOPMENT WILL CONSIST OF: (1) UPGRADE WORKS TO THE EXISTING BUNCRANA WWTP REQUIRING AN EXPANSION OF THE EXISTING SITE TO INCREASE ITS DESIGN POPULATION EQUIVALENT (PE) FROM 13,200PE TO 17,700PE COMPRISING (A) CONSTRUCTION OF A SECONDARY TREATMENT TANK, BLOWERS AND SOUND ATTENUATION BARRIER, PUMP SUMP AND VENT STACK, FLOW METER CHAMBER, VALVE CHAMBER, ADMINISTRATION BUILDING, FLOOD PROTECTION WALL, 2 NO. PICKET FENCE THICKENER TANKS, A SITE DRAINAGE PUMPING STATION, INTERNAL SITE ACCESS ROAD, INTERCONNECTING PIPEWORK AND MANHOLES AND 4 NO. PARKING SPACES, (B) INTERNAL UPGRADES TO THE INLET WORKS BUILDING, INTERNAL UPGRADES TO THE CONTROL AND SLUDGE DEWATERING BUILDING, INTERNAL UPGRADES TO THE OUTFALL PUMPING STATION, REPURPOSING OF THE PRIMARY SETTLEMENT TANKS AS FINAL EFFLUENT BALANCING TANKS, RECONFIGURATION OF THE FLOW DISTRIBUTION CHAMBER AND INTERNAL UPGRADES TO THE SLUDGE HOLDING TANK, (C) REPLACEMENT OF THE EXISTING SITE ACCESS GATE WITH A PALISADE SECURITY GATE, (D) INSTALLATION OF ROOF MOUNTED SOLAR PHOTOVOLTAIC (PV) PANELS ON SOUTH FACING ROOFS OF THE EXISTING INLET WORKS, CONTROL AND SLUDGE DEWATERING AND PROPOSED ADMINISTRATION BUILDINGS, (E) DECOMMISSIONING AND DEMOLITION OF THE EXISTING SITE DRAINAGE PUMPING STATION, GAS HOLDING TANK, PICKET FENCE THICKENER AND SLUDGE DIGESTION TANK AND (F) ALL HARD AND SOFT LANDSCAPING WORKS INCLUDING SCREEN PLANTING AND ALL ASSOCIATED ANCILLARY WORKS INCLUDING SITE WORKS AND TEMPORARY WORKING AREAS, (2) UPGRADE WORKS TO THE EXISTING FAHAN WWTP TO CONVERT IT INTO A WASTEWATER PUMPING STATION (WWPS) COMPRISING (A) CONSTRUCTION OF A STORMWATER HOLDING TANK, PUMP SUMP AND VENT STACK, VALVE CHAMBER, INLET FLUME, SURGE VESSEL, WET KIOSK, 2 NO. CONTROL KIOSKS, CHEMICAL SKID, BUNDED CHEMICAL STORAGE TANK, EMERGENCY SHOWER, WELFARE UNIT, FLOOD PROTECTION WALL WITH GATE, INTERCONNECTING PIPEWORK AND MANHOLES, (B) DECOMMISSIONING AND DEMOLITION OF THE SITE GATE AND WING WALLS, SEPTIC TANK AND PRELIMINARY EQUIPMENT, (C) MATERIAL ALTERATION OF THE EXISTING SITE ACCESS TO INCORPORATE A NEW AND REALIGNED SECURITY MESH SITE GATE AND WINGWALLS AN
Open official record