New ApplicationPre-decision · not yet granted

Infrastructure, CARROWMORE, MALIN, CO. DONEGAL

Malin, Donegal · Donegal County Council · Plan 2650103 · PB ref PB-3139517785

(1) PROVISION OF 6NO. 21M HIGH POLES WITH LED FLOODLIGHTING TO THE MAIN / TRAINING PITCHES INCLUDING DUCTING AND CABLING AND THE REMOVAL OF EXISTING METAL HALIDE FLOODLIGHTING AND (2) PROVISION OF A PERIMETER WALKWAY TO THE MAIN PITCH WITH LOW LEVEL LIGHTING AND ALL ASSOCIATED SITE WORKS

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Received 5 Aug 2026 public planning date
Commenced None indexed public commencement index
Applied for, not granted

The record describes what is sought. Nothing is permitted until the authority decision.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

A decision-stage public state is indexed. / Confidence: Low
Decision N/A

A decision-stage public state is indexed.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

(1) PROVISION OF 6NO. 21M HIGH POLES WITH LED FLOODLIGHTING TO THE MAIN / TRAINING PITCHES INCLUDING DUCTING AND CABLING AND THE REMOVAL OF EXISTING METAL HALIDE FLOODLIGHTING AND (2) PROVISION OF A PERIMETER WALKWAY TO THE MAIN PITCH WITH LOW LEVEL LIGHTING AND ALL ASSOCIATED SITE WORKS

Ref 2650103 Source-linked Official application description for exact planning reference 2650103

Public source roles

Care of the Smyth Partnership
Planning agent named on the public planning record
Submission role only; current appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Donegal County Council
Exact reference
2650103
Evidence reviewed
11 Aug 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

1 source-supported signals
Infrastructure

Infrastructure

The public application record identifies infrastructure in the submitted planning scope.

2650103Explicit application record

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Malin GAA
Planning agent
Care of the Smyth Partnership
Agent address
CULKENNY MALIN CO. DONEGAL
Official description

Application text

(1) PROVISION OF 6NO. 21M HIGH POLES WITH LED FLOODLIGHTING TO THE MAIN / TRAINING PITCHES INCLUDING DUCTING AND CABLING AND THE REMOVAL OF EXISTING METAL HALIDE FLOODLIGHTING AND (2) PROVISION OF A PERIMETER WALKWAY TO THE MAIN PITCH WITH LOW LEVEL LIGHTING AND ALL ASSOCIATED SITE WORKS

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal possible yet The application has not been decided.
CommencementPublic commencement index
  1. Commenced No commencement indexed A scheme cannot start before it is permitted.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2650103

(1) PROVISION OF 6NO. 21M HIGH POLES WITH LED FLOODLIGHTING TO THE MAIN / TRAINING PITCHES INCLUDING DUCTING AND CABLING AND THE REMOVAL OF EXISTING METAL HALIDE FLOODLIGHTING AND (2) PROVISION OF A PERIMETER WALKWAY TO THE MAIN PITCH WITH LOW LEVEL LIGHTING AND ALL ASSOCIATED SITE WORKS

AuthorityDonegal County Council
Reference2650103
StatusChecked 11 Aug 2026
Open official record