Development Description
(1) THE INCREASE IN RIDGE HEIGHT OF PART OF THE DWELLING HOUSE TO MATCH WITH THE HIGHER ROOF LINE, (2) ALTERATION OF AN EXISTING FLAT ROOF TO A PITCHED ROOF AT THE FRONT OF THE DWELLING HOUSE, (3) REPLACEMENT OF EXISTING SEPTIC TANK WITH A NEW UPGRADED WASTE WATER TREATMENT SYSTEM, AND (4) ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS