Commercial fit-out, BLUEHAVEN HOTEL, LARGYMORE, KILCAR, CO. DONEGAL
(1) RETENTION OF (A) EXTERNAL SITE DEVELOPMENT WORKS TO THE FRONT OF THE HOTEL TO INCLUDE FOR NEW PAVING AND SEATED AREAS, WITH WALL AND GLASS FEATURES, (B) ELEVATIONAL AMENDMENTS TO ALL FACADES OF THE HOTEL AND NEW ESCAPE CORRIDOR TO NORTH EAST OF BUILDING, (C) 2NO. BUS PULL IN BAYS TO EITHER SIDE OF THE MAIN ROADWAY...
The public decision state is shown, but conditions and later amendments can still change delivery scope.
Package signals below are limited to wording in the public application record.
No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.
Opportunity & supplier intelligence
What is known, and what may happen next
Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.
A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.
Decision date 24 Sep 2026. / Confidence: LowDecision date 24 Sep 2026.
Open evidenceNo commencement indexed / This is an index state, not proof that no works have started.
Source limitedNo drawing entry is available in this lead's bounded document evidence.
Source limitedConfirmed scope
Confirmed application scope
(1) RETENTION OF (A) EXTERNAL SITE DEVELOPMENT WORKS TO THE FRONT OF THE HOTEL TO INCLUDE FOR NEW PAVING AND SEATED AREAS, WITH WALL AND GLASS FEATURES, (B) ELEVATIONAL AMENDMENTS TO ALL FACADES OF THE HOTEL AND NEW ESCAPE CORRIDOR TO NORTH EAST OF BUILDING, (C) 2NO. BUS PULL IN BAYS TO EITHER SIDE OF THE MAIN ROADWAY (R-263-5), (D) WORKS TO LOWER CARPARK AREA ALLOWING FOR A SINGLE ENTRANCE TO EXISTING CARPARK FACILITY, (E) RETAINING WALL AND ASSOCIATED SITE DEVELOPEMENT WORKS TO THE REAR OF THE HOTEL, (F)...
Open scope evidenceNamed firms
Public source roles
- Ccm Leisure Ltd
- Applicant / promoter on the public planning record
- Application role only; current development or appointment status is not confirmed.
Evidence-backed work packages
Explicit source signals only
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Confidence & provenance 1 official source
- Authority
- Donegal County Council
- Exact reference
- 2661461
- Evidence reviewed
- 26 Sep 2026
- Confidence
- Source-linked
Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.
What the public record evidences
Commercial fit-out
The public application record identifies commercial fit-out in the submitted planning scope.
Roads and site-development scope
The public application description explicitly references roads and site-development scope.
Only source-supported scope signals are shown; generic trade padding is omitted.
More actions
Named source parties
- Promoter
- Ccm Leisure Ltd
- Planning agent
- Care of Cornerstone Associates
- Agent address
- MOUNTAIN TOP LETTERKENNY CO. DONEGAL F92 RX0P
More Donegal planning activity
These are county discovery links, not claimed relationships to this application.
Application text
(1) RETENTION OF (A) EXTERNAL SITE DEVELOPMENT WORKS TO THE FRONT OF THE HOTEL TO INCLUDE FOR NEW PAVING AND SEATED AREAS, WITH WALL AND GLASS FEATURES, (B) ELEVATIONAL AMENDMENTS TO ALL FACADES OF THE HOTEL AND NEW ESCAPE CORRIDOR TO NORTH EAST OF BUILDING, (C) 2NO. BUS PULL IN BAYS TO EITHER SIDE OF THE MAIN ROADWAY (R-263-5), (D) WORKS TO LOWER CARPARK AREA ALLOWING FOR A SINGLE ENTRANCE TO EXISTING CARPARK FACILITY, (E) RETAINING WALL AND ASSOCIATED SITE DEVELOPEMENT WORKS TO THE REAR OF THE HOTEL, (F) RECONFIGURATION OF THE KITCHEN / STORE AREAS, TOILETS AND ESCAPE ROUTES TO THE REAR OF HOTEL, (G) CURRENT LOCATION OF SEWAGE TREATMENT SYSTEM, (2) DEMOLITION OF EXISTING CURVED PORCH, (3) CONSTRUCTION OF A NEW FRONT ENTRANCE PORCH, (4) ERECTION OF 4NO. ROAD SIGNS FOR THE BUS PULL IN AREA, (5) ADDITIONAL SIGNAGE BOARDS TO THE HOTEL FRONT, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
Application to site progress
-
Applied 5 Aug 2026 2661461
-
Decision Conditional 24 Sep 2026
-
Appeal No appeal indexed No public appeal record is indexed against this application.
-
Commenced No commencement indexed No reliable public commencement record is indexed against this permission.
-
Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Source, scope and limits
Application description and scale 2661461
(1) RETENTION OF (A) EXTERNAL SITE DEVELOPMENT WORKS TO THE FRONT OF THE HOTEL TO INCLUDE FOR NEW PAVING AND SEATED AREAS, WITH WALL AND GLASS FEATURES, (B) ELEVATIONAL AMENDMENTS TO ALL FACADES OF THE HOTEL AND NEW ESCAPE CORRIDOR TO NORTH EAST OF BUILDING, (C) 2NO. BUS PULL IN BAYS TO EITHER SIDE OF THE MAIN ROADWAY (R-263-5), (D) WORKS TO LOWER CARPARK AREA ALLOWING FOR A SINGLE ENTRANCE TO EXISTING CARPARK FACILITY, (E) RETAINING WALL AND ASSOCIATED SITE DEVELOPEMENT WORKS TO THE REAR OF THE HOTEL, (F) RECONFIGURATION OF THE KITCHEN / STORE AREAS, TOILETS AND ESCAPE ROUTES TO THE REAR OF HOTEL, (G) CURRENT LOCATION OF SEWAGE TREATMENT SYSTEM, (2) DEMOLITION OF EXISTING CURVED PORCH, (3) CONSTRUCTION OF A NEW FRONT ENTRANCE PORCH, (4) ERECTION OF 4NO. ROAD SIGNS FOR THE BUS PULL IN AREA, (5) ADDITIONAL SIGNAGE BOARDS TO THE HOTEL FRONT, TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
Open official record