Save this project to account
New Application · decision due 2 Nov 2026Pre-decision · not yet granted

Energy, CRILLY, TULLYLINN, PETTIGOE DONEGAL PO

Pettigoe Donegal Po, Donegal · Donegal County Council · Plan 2661665 · PB ref PB-3077966365

VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE DURATION OF THE CONSTRUCTION WORKS TO FACILITATE THE PERMITTED DEVELOPMENT. IT IS PROPOSED TO VARY CONDITION NO. 4 TO EXTEND THE DURATION OF THE...

Indicative value Not listed PB indicative band
Units applied for Not listed public application record
Floor area Not listed no reliable figure indexed
Decision due 2 Nov 2026 public planning date
Commenced None indexed public commencement index
Applied for, not granted

The record describes what is sought. Nothing is permitted until the authority decision.

Application scope

Package signals below are limited to wording in the public application record.

Not procurement evidence

No tender, award, contractor appointment, supplier appointment or procurement timetable is inferred.

Opportunity & supplier intelligence

What is known, and what may happen next

Source-linked

Timing is a planning-stage outlook, not a tender, award, contractor appointment, supplier appointment or guaranteed procurement date.

Likely procurement timing Post-decision monitoring

A planning decision is recorded and no linked commencement is indexed. Conditions, procurement and start timing remain unconfirmed.

A decision-stage public state is indexed. / Confidence: Low
Decision N/A

A decision-stage public state is indexed.

Commencement activity No linked activity indexed

No commencement indexed / This is an index state, not proof that no works have started.

Source limited
Drawings availability Drawing availability not indexed

No drawing entry is available in this lead's bounded document evidence.

Source limited

Confirmed application scope

VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE DURATION OF THE CONSTRUCTION WORKS TO FACILITATE THE PERMITTED DEVELOPMENT. IT IS PROPOSED TO VARY CONDITION NO. 4 TO EXTEND THE DURATION OF THE CONSTRUCTION WORKS BY 5 YEARS TO FACILITATE THE CONSTRUCTION OF THE PREVIOUSLY PERMITTED DEVELOPMENT COMPRISING 4 NO. WIND TURBINES WITH A MAXIMUM BLADE DIAMETER OF 93M AND A MAXIMUM BLADE TIP...

Ref 2661665 Source-linked Official application description for exact planning reference 2661665

Public source roles

Rsc Windfarms Ltd
Applicant / promoter on the public planning record
Application role only; current development or appointment status is not confirmed.
Care of Canavan Associates Ltd
Planning agent named on the public planning record
Submission role only; current appointment status is not confirmed.

Explicit source signals only

0 packages

No work package meets the explicit source, reference and locator threshold. PlanningBrief does not pad this list with generic trades.

Confidence & provenance 0 official sources
Authority
Donegal County Council
Exact reference
2661665
Evidence reviewed
26 Sep 2026
Confidence
Source-linked

Facts come from the indexed public planning record and any bounded structured document evidence. No request-time official fetch, tender, award or appointment inference is used.

Application-stage scope

What the public record evidences

2 source-supported signals
Energy

Energy

The public application record identifies energy in the submitted planning scope.

2661665Explicit application record
Site works

Roads and site-development scope

The public application description explicitly references roads and site-development scope.

2661665Explicit description signal

Only source-supported scope signals are shown; generic trade padding is omitted.

Project facts

Named source parties

Promoter
Rsc Windfarms Ltd
Planning agent
Care of Canavan Associates Ltd
Agent address
23 PRINCE'S STREET DERRY NORTHERN IRELAND BT48 7EY
Official description

Application text

VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE DURATION OF THE CONSTRUCTION WORKS TO FACILITATE THE PERMITTED DEVELOPMENT. IT IS PROPOSED TO VARY CONDITION NO. 4 TO EXTEND THE DURATION OF THE CONSTRUCTION WORKS BY 5 YEARS TO FACILITATE THE CONSTRUCTION OF THE PREVIOUSLY PERMITTED DEVELOPMENT COMPRISING 4 NO. WIND TURBINES WITH A MAXIMUM BLADE DIAMETER OF 93M AND A MAXIMUM BLADE TIP HEIGHT OF 126.5M, ALL ANCILLARY DEVELOPMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS. THE PERMITTED DEVELOPMENT INCLUDES ACCESS OFF SEEGRONAN ROAD, KILLETER, CASTLEDERG, CO. TYRONE AND NO ALTERATION IS PROPOSED TO THE NATURE, SCALE OR DESIGN OF THE PERMITTED DEVELOPMENT. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

Source-aware chronology

Application to site progress

Empty lanes explain their state.
AppealsAn Coimisiún Pleanála
  1. Appeal No appeal possible yet The application has not been decided.
CommencementPublic commencement index
  1. Commenced No commencement indexed A scheme cannot start before it is permitted.
CompletionPublic completion projection
  1. Completed Completion not recorded No privacy-cleared exact completion certificate is linked to this permission. Absence is not evidence that the project is incomplete.
Evidence register

Source, scope and limits

Public planning record
Application description and scale 2661665

VARIATION OF CONDITION NO. 4 OF PERMISSION GRANTED FOR CRILLY WIND FARM (PLANNING REF. NO. 13/51404 AND AN COIMISIÚN PLEANÁLA REF. ABP PL 05E.245588 REFERS) WHICH RELATES TO THE DURATION OF THE CONSTRUCTION WORKS TO FACILITATE THE PERMITTED DEVELOPMENT. IT IS PROPOSED TO VARY CONDITION NO. 4 TO EXTEND THE DURATION OF THE CONSTRUCTION WORKS BY 5 YEARS TO FACILITATE THE CONSTRUCTION OF THE PREVIOUSLY PERMITTED DEVELOPMENT COMPRISING 4 NO. WIND TURBINES WITH A MAXIMUM BLADE DIAMETER OF 93M AND A MAXIMUM BLADE TIP HEIGHT OF 126.5M, ALL ANCILLARY DEVELOPMENTS AND ASSOCIATED SITE DEVELOPMENT WORKS. THE PERMITTED DEVELOPMENT INCLUDES ACCESS OFF SEEGRONAN ROAD, KILLETER, CASTLEDERG, CO. TYRONE AND NO ALTERATION IS PROPOSED TO THE NATURE, SCALE OR DESIGN OF THE PERMITTED DEVELOPMENT. THIS DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

AuthorityDonegal County Council
Reference2661665
StatusChecked 26 Sep 2026
Open official record