Infrastructure · Co. Dublin

Development of an education and research building, Dublin 2, Co. Dublin

Granted on appeal 4 Feb 2020 (Granted 27 Aug 2019 by the council)

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 2 by email

Key facts

  • Planning application 2016/19 at Dublin 2, Co. Dublin: Development of an education and research building.
  • It was received by Dublin City Council on 4 Jan 2019.
  • Status: Granted on appeal 4 Feb 2020 (Granted 27 Aug 2019 by the council).
  • Work was due to start on 22 Feb 2022, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register

More planning applications in Dublin 2 · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 27 Aug 2019.

Application details as we last saw them in the national register on 2 Jun 2026.

What and where

Development of an education and research building

Permission for the development of an education and research building on a site of c. 0.3945 hectares comprising Block A Ardilaun Centre (also known as Nos. 112-114), St. Stephen's Green, Dublin 2, D02 AF59, No. 4, Proud's Lane, Dublin 2, D02 WY28, part of No. 26 York Street, Dublin 2, D02 P796 and part of the courtyard of the Ardilaun Centre, Dublin 2. The development will consist of the demolition of Block A Ardilaun Centre (vacant office of varying heights from five to eight storeys over basement/lower ground floor) (7,904 m²), No. 4 Proud's Lane (office) (three storeys) (265 m²), an ESB substation and security hut to the rear of No. 26 York Street at Cuffe Lane (12 m² and 11 m², respectively) and the podium and basement car park and associated ramp access vis Cuffe Lane serving No. 26 York Street and Ardilaun Centre (1,135 m²), and the construction of a Third-Level Education building including research (laboratories), teaching, faculty, administration, staff and student services (including catering, recreation and welfare facilities), ancillary teaching and learning spaces, public engagement space and associated ancillary spaces, building infrastructure and support. The development will consist of the construction of a building of varying heights from five to eight storeys (including setbacks) (with roof top plant) of 10,339 m² gross floor area (including roof top plant of 74 m²) over lower ground floor (1,420 m²) and basement (1,585 m²) levels. The development will also include the provision of: a ground floor level entrance lobby to No. 26 York Street to its south elevation (12 m²); a second floor level link connecting the new building to second floor level of No. 26 York Street; and an ESB substation and security hut to the rear of No. 26 York Street at Cuffe Lane (11 m² and 9 m² respectively). The development includes a cantilever at third and fourth floor levels to the east elevation, and terraces to the north elevation at third floor level, to the south elevation at third, fourth and fifth floor levels, and the east elevation at fifth floor level. The development will include: the reconfiguration of the existing vehicular ramp; the relocation of existing bicycle parking spaces (100 no.) for No. 26 York Street to lower ground floor level and the provision of an additional 96 No. bicycle parking spaces at this location; related elevational works; vehicular and bicycle access via Cuffe Lane and pedestrian access via St. Stephen's Green, Proud's lane and Cuffe Lane; changes in level; boundary treatments (and revisions to existing boundaries, where applicable) and access gates; balconies and terraces; associated lighting; the relocation of a 450mm combined public sewer from underneath the Ardilaun Centre car park and associated ramp to the proposed landscaped courtyard; associated site servicing (foul and surface water drainage and water supply) and related pipework and tanks; the provision of SUDs measures, including attenuation tanks and green roofs; disabled car parking; solar panels; waste management areas; all hard and soft landscaping (including tree and planting removal); boundary treatments; changes in level; and all other associated site excavation and site development works above and below ground.

Location
Dublin 2, Co. Dublin Map
Planning reference
2016/19

Numbers and dates

Floor area
11,833 m²
Project type
Infrastructure
Received
4 Jan 2019
Council decision
27 Aug 2019
Appeal lodged
23 Sep 2019
Granted on appeal
4 Feb 2020
Site start notified
22 Feb 2022

Timeline

  1. Application received
  2. Granted by the council
  3. Appeal lodged
  4. Appeal decidedGrant permission with revised conditions
  5. Site start notified

Outlook

What happens next

Work was due to start on 22 Feb 2022, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Roads and site development worksNamed in the application description
  • Services and drainageNamed in the application description
  • Basement parkingNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

How we know this

From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 22 Feb 2022Notice filed · Demolition of existing Block A, 4 Prouds Lane and Ardilaun carpark structure to the rear...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 2

Get alerts for Dublin 2Free. We email you when new applications appear.

Free email alerts

Get new Dublin 2 projects by email

New applications, decisions and site starts in Dublin 2, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options