Infrastructure · Co. Dublin
Amendments to the office development permitted under Reg. Ref, Dublin 4, Co. Dublin
Granted 31 May 2019 (final grant issued 7 Oct 2019)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 4 by email
Key facts
- Planning application 2065/19 at Dublin 4, Co. Dublin: Amendments to the office development permitted under Reg. Ref.
- It was received by Dublin City Council on 16 Jan 2019.
- Status: Granted 31 May 2019 (final grant issued 7 Oct 2019).
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 4 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 31 May 2019.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Amendments to the office development permitted under Reg. Ref
Planning permission for amendments to the office development permitted under Reg. Ref: 2221/16 & ABP Ref.: PL 29S.246717 and subsequent amendments under Reg. Ref.: 4456/16, Reg. Ref.: 2500/17, Reg. Ref.: 2953/17 and Reg. Ref. 4358/18 at a site of c. 1.56ha. located on the former AIB Bank Centre lands at the junction of Merrion Road and Serpentine Avenue, Ballsbridge, Dublin 4. The proposed amendments consist of: 1. Provision of an additional storey (5th floor) to both Block 1 and 2 bringing the parapet level to a height of 24 metres; 2. Addition of a pedestrian link bridge between Block 1 and Bock 2 at second floor level; 3. Replacement of permitted glass fin detail to elevations at fourth floor in lieu of double skin glazed facade to match the proposed 5th floor with associated glazing detail over parapets; 4. Relocation of internal glazed atria of Blocks 1 and 2 to provide two glazed atria on Blocks 1 and 2 connecting to the plaza with associated alterations to elevations and internal reconfigurations; 5. Addition of 2 no. two storey pedestrian link bridges between the permitted blocks and the existing blocks to the north at first and second floor levels; 6. Revised plants and associated screening to roof level; 7. Minor increase in footprint of sub-basement level; 8. All ancillary and associated site development and landscaping works. The proposed amendments result in an overall Gross Floor Area increase of 3.740 sq.m to a total of 57,140 sq.m for the two blocks.
- Location
- Dublin 4, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 2065/19
Numbers and dates
- Floor area
- 3,740 m²
- Project type
- Infrastructure
- Received
- 16 Jan 2019
- Decision to grant
- 31 May 2019
- Final grant
- 7 Oct 2019
- Site start notified
- 24 Jun 2021
Timeline
- Application received
- Decision to grant
- Appeal lodged
- Appeal decidedAppeal withdrawn S.140(1)(a)
- Final grant issued
- Site start notified
Site history
This site's history
-
Earlier planning reference 4358/18, named in this application's description: commencement notice filed for a start on 4 Mar 2019.
Construction of 2 no. 5 storey office buildings (with a setback 5th floor) over 3 at Ballsbridge, Dublin 4. Named in this application's description
Earlier records are the planning references this application names, records at the same address, and records within 50 m of the same map point. An address or a map point can cover more than one property, so check the council's file before relying on a match.
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 2065/19.Search the register
- AppealAppeal withdrawn S.140(1)(a) · 304755 / 26 Sep 2019View the appeal record
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 24 Jun 2021Notice filed · Provision of an additional storey 2 no. office buildings increasing to six storeys with...View the site start
- Completion certificate recordedRecorded in Jun 2021 · 2 units on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area