Public / civic · Co. Dublin
Change of use, Dublin 1, Co. Dublin
Granted 17 Jul 2020 (final grant issued 28 Aug 2020)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 1 by email
Key facts
- Planning application 2681/20 at Dublin 1, Co. Dublin: Change of use.
- It was received by Dublin City Council on 8 May 2020.
- Status: Granted 17 Jul 2020 (final grant issued 28 Aug 2020).
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 1 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 17 Jul 2020.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Change of use
PROTECTED STRUCTURE: The proposed development will consist of the change of use, renovation and extension of the existing two storey protected structure to provide a new distributed museum, exhibition and multi-functional space to be operated by Dublin Port Company. The development will include: stability improvement works to the protected structure comprising underpinning and rehabilitation works of existing masonry walls, piling works to a new ground floor slab, construction of additional internal structural steelwork, and removal of existing temporary shoring and bracing; removal of stairs and first floor mezzanine slab (60 m²) within the protected structure; provision of lighting to the exterior of the protected structure; excavation works within the protected structure to expose the historic sea wall running under the site boundary with East Wall Road (15.9 m²), and provision of waterproofing, drainage measures and a protective railing; part removal of the existing southern façade to form an opening to a proposed contemporary flat roof glazed extension (7.4m in height providing an additional 86 m² at ground floor level and 13.2 m² at first floor level) to provide additional museum/exhibition floor space, a service area, unisex WC and storage area; provision of solar photovoltaic panels at roof level of the protected structure and proposed extension; rearrangement of the landscaped public plaza to the south of the protected structure to include new/relocated seating arrangements, lighting column, planting and resurfacing; and all associated ancillary site development works including revised utilities/drainage arrangements.
- Location
- Dublin 1, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 2681/20
Numbers and dates
- Floor area
- 175 m²
- Project type
- Public / civic
- Received
- 8 May 2020
- Decision to grant
- 17 Jul 2020
- Final grant
- 28 Aug 2020
- Site start notified
- 29 Sep 2021
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 2681/20.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 29 Sep 2021Notice filed · The proposed works consist of the change of use, material alteration and extension of...View the site start
- Completion certificate recordedRecorded in Sep 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area