Infrastructure · Co. Dublin
"Boston Sidings Site" at Grand Canal Quay and Macken Street, Dublin 2
Granted on appeal 7 Oct 2019 (Granted 12 Jun 2019 by the council)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 2 by email
Key facts
- Planning application 2808/19 at "Boston Sidings Site" At Grand Canal Quay and Macken Street, Dublin 2: 10 storey over basement office development with setbacks.
- It was received by Dublin City Council on 18 Apr 2019.
- Status: Granted on appeal 7 Oct 2019 (Granted 12 Jun 2019 by the council).
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 2 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 12 Jun 2019.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
10 storey over basement office development with setbacks
Permission for development at this site (0.37ha) known as "Boston Sidings Site" at Grand Canal Quay and Macken Street, Dublin 2. (Lands bound by Clanwilliam Square to the south, Grand Canal Quay to the east, the Dublin - Rosslare mainline railway to the north and Macken Villas and Macken Street to the west). The development will consist of construction of a 10 storey over basement office development with setbacks at 5th and 7th floor levels an external terrace areas at 5th, 6th and 7th floor levels with a gross floor area of 19,856sq.m. The proposed accommodation will consist of office (designed for single or multiple tenancies) and ancillary uses with associated lift and stair cores with pedestrian, cycle and vehicular access from Grand Canal Quay. The development of the site will be facilitated by removal of the existing fill material within the site to create a new ground level fronting Grand Canal Quay and modifications to the existing eastern boundary wall to Grand Canal Quay (currently c.45m in length) involving demolition of c.15.8m of the wall and the creation of openings within the remaining c.29.2m to provide visual and physical access to the proposed office accommodation behind. The proposed ground floor accommodation comprises office reception and foyer areas fronting Grand Canal Quay with office and ancillary accommodation to the rear. A proposed landscaped access route separates the proposed office block from the existing boundary wall with Clanwilliam Square to the south which is to be structurally secured and retained. This route provides access to the rear (western end) of the block which accommodates ancillary accommodation including bicycle parking (199no. spaces), bin storage, plant rooms, staff facilities and an ESB substation. A car lift provides access to the basement accommodation incorporating 25no. car parking spaces and ancillary plant and storage rooms. Above ground floor level accommodation includes a mezzanine floor level with office and additional ancillary plant and storage rooms and 8 levels of office accommodation above. Permission is also sought for hard and soft landscaping within the site, external lighting, screened plant area at 8th floor level and all ancillary site and development works. The existing Macken Street entrance will be maintained to facilitate continued access by Iarnod Eireann/CIE to the existing signalling building which will be retained on site adjacent to the proposed office building.
- Location
- Dublin 2, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 2808/19
Numbers and dates
- Floor area
- 19,856 m²
- Project type
- Infrastructure
- Received
- 18 Apr 2019
- Council decision
- 12 Jun 2019
- Appeal lodged
- 9 Jul 2019
- Granted on appeal
- 7 Oct 2019
- Site start notified
- 4 May 2021
Timeline
- Application received
- Granted by the council
- Appeal lodged
- Appeal decidedGrant permission with revised conditions
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 2808/19.Search the register
- AppealGrant permission with revised conditions · 304878 / 7 Oct 2019View the appeal record
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 4 May 2021Notice filed · Construction of proposed office building 'The Sidings' which will consist of a ten...View the site start
- Completion certificate recordedRecorded in May 2021 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.