Protected structure · Co. Dublin
Leeson Lounge, 147-148, Leeson Street Upper, Dublin 4
Granted 9 Mar 2022
Key facts
- Planning application 3004/21 at Leeson Lounge, 147-148, Leeson Street Upper, Dublin 4: ~3 homes.
- It was received by Dublin City Council on 21 Jun 2021.
- Status: Granted 9 Mar 2022.
- Work started on site on 23 May 2024, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 4 · Planning applications in Co. Dublin
Since you last looked
Worked out in this browser from the record's own dates. We do not send emails about it.
Council register
The council's register shows: Granted on 9 Mar 2022.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
~3 homes
PROTECTED STRUCTURE: Permission for alterations to existing buildings. The alterations include change of use and internal alterations at first, second and third floor levels of 148 Leeson Street Upper from first floor lounge and second floor kitchen/ residential bedroom, third floor vacant/ storage, to one no. 1 bedroom apartment and one no. 2 bedroom duplex apartment with 2 no. velux roof lights in bathrooms at 3rd floor level. Internal alterations to layouts of existing 1 no. 2 bedroom apartment and 2 no. 1 bedroom apartments creating 3 no. 1 bedroom apartments at 147 Leeson Street Upper. Alterations to existing bar at ground floor comprising removal of existing 1970s interior and refit of pub interior, refurbish existing toilets and provide new raised seating area, alterations to basement to include new kitchen and staff facilities including reducing floor levels to achieve ceiling height of 2.4 m and provision of an alternative exit from basement by means of reopening disused cellar hatch, new ventilation supply and extract ductwork to proposed kitchen area. Removal of non-original rendered masonry panels and fenestration at ground level and provision of new shopfront with new entrance and fire exits. Refurbishment and upgrade of sash windows and oriel windows and replacement of non-original windows and repointing of facade (147). Demolition of rear return store rear 148 (first floor) and reinstatement of original window and general fire upgrade and conservation works.
- Location
- Dublin 4, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 3004/21
Numbers and dates
- Homes
- ~3estimated from the application
- Estimated construction value
- €660k to €930kOur estimate from stated homes and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Protected structure
- Received
- 21 Jun 2021
- Granted
- 9 Mar 2022
- Site start
- 23 May 2024
- Protected structure
- Yes
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 3004/21.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 23 May 2024Work started · PROTECTED STRUCTURE: Alterations to existing buildings. The alterations include change...
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.