Planning record · Co. Dublin

12, Leinster Street South, Dublin 2, D02H367

Granted 6 Nov 2024 (final grant issued 16 Dec 2024)

We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 2 by email

Key facts

  • Planning application 3593/24 at 12, Leinster Street South, Dublin 2, D02H367: ~6 homes.
  • It was received by Dublin City Council on 26 Apr 2024.
  • Status: Granted 6 Nov 2024 (final grant issued 16 Dec 2024).
  • Work was due to start on 16 Sep 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.

Source: the Dublin City Council planning register, as last seen on 5 Oct 2026. Search the council's register

More planning applications in Dublin 2 · Planning applications in Co. Dublin

Council register

The council's register shows: Granted on 6 Nov 2024.

Application details as we last saw them in the national register on 5 Oct 2026.

What and where

~6 homes

Planning permission for development on a site of 0.0116 ha at No. 12 Leinster Street South, Dublin 2, D02 H367 (a Protected Structure Ref. 4787). The proposed development seeks permission for: the change of use from vacant office/ travel agents at part-Ground, First, Second and Third Floor Levels to student accommodation, comprising 6 No. studio units and associated ancillary development including associated reception, lobby, plant area, storage and cleaners area (c. 197 sq m). There are no changes proposed to the existing restaurant use at Basement and part-Ground Floor Levels. The proposed development will also consist of the use of the proposed student accommodation development for temporary short-stay tourist / visitor accommodation use outside of the academic year of no more than two months per annum. The proposed development also consists of refurbishment and works to No. 12 Leinster Street South comprising alterations and repairs to the building including the: replacement of the existing shopfront (with associated new signage zone); removal of existing internal partitions and doors as required and the construction of new internal partitions and doors from Ground to Third Floor Levels; provision of en-suite bathrooms and kitchenettes for each studio unit from First to Third Floor Levels; modifications to the building's external façade (including the replacement of an existing window ope with a door ope and replacement of an existing door ope with a window ope on the Leinster Lane façade; the replacement of existing windows; raking out and repointing of brickwork; removal of redundant electrical services, piped services and boxed out services; and removal of existing signage and ancillary elements); and removal of existing flat roof and provision of a new pitched roof and associated drainage elements. The development will also consist of: associated site servicing (foul and surface water drainage and water supply); and all other associated site servicing and development works above and below ground.

Location
Dublin 2, Co. Dublin Map
Planning reference
3593/24

Numbers and dates

Homes
~6estimated from the application
Floor area
197 m²
Project type
Planning record
Received
26 Apr 2024
Decision to grant
6 Nov 2024
Final grant
16 Dec 2024
Site start notified
16 Sep 2026
Protected structure
Yes

Timeline

  1. Application received
  2. Decision to grant
  3. Final grant issued
  4. Site start notified

Outlook

What happens next

Work was due to start on 16 Sep 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed. View the site start

Work packages named so far

  • Conservation work to a protected structureNamed in the application description
  • Services and drainageNamed in the application description

An outlook from the planning record, not a tender or a confirmed start date.

Documents and evidence

Check the record

  • Council planning registerSearch planning.agileapplications.ie for reference 3593/24.Search the register

How we know this

From the Dublin City Council planning register, as last seen on 5 Oct 2026. The council's own file is the official record.

Site starts

Commencement notices for this permission

  1. 16 Sep 2026Notice filed · The proposed development seeks permission for: the change of use from vacant...View the site start

A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.

Explore the area

More planning activity near Dublin 2

Get alerts for Dublin 2Free. We email you when new applications appear.

Free email alerts

Get new Dublin 2 projects by email

New applications, decisions and site starts in Dublin 2, Co. Dublin. Only when there is something new.

We send a confirmation link first. Nothing starts until you click it. You can unsubscribe at any time.

More alert options