Infrastructure works, Dublin 1, Co. Dublin
Granted 16 Oct 2023
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 1 by email
Key facts
- Planning application 4009/23 at Dublin 1, Co. Dublin: Infrastructure works.
- It was received by Dublin City Council on 22 Jun 2023.
- Status: Granted 16 Oct 2023.
- Work started on site on 1 Feb 2024, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 1 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 16 Oct 2023.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Infrastructure works
The proposed development, which provides for alterations to the permitted building comprises an increase in the size of the permitted Mezzanine, first and seventh floor levels (from 1,805 sq m floor are total permitted across these levels to 2.287 sq m floor area total proposed across these levels), and a decrease in the size of the permitted ground, second, third, fourth, fifth and sixth floor levels (from 5.683sq m floor are total permitted across these levels to 5,518 sq m floor area total proposed across these levels) (no change in size to the permitted basement level (324 sq m) is proposed); the reconfiguration of the internal layout of all levels of the permitted building (from basement to seventh floor levels), to include amendments to the hotel bedrooms and related ancillary hotel facilities including work space, reception area, lobby and restaurant with public bar, storage areas, administration and staff facilities, plant, waste storage area and bicycle store, ancillary space (which includes areas such as circulation cores (lifts and stairs) and routes, plant areas throughout the building, electrical substations and switch rooms, toilets and shower areas etc.), and lightwell (including the extension to the lightwell to the enlarged Mezzanine level); alterations to the permitted building's elevations from ground to seventh floor levels, including alterations to the lightwell elevations; alterations to the permitted plant areas at roof level and associated relocation of the roof plant screen, where required; an increase in the thickness of the external wall around the permitted buildings perimeter from ground to seventh floor levels; alterations to the permitted finished floor levels and external roof build-up of the permitted building resulting in an increase in the height of the building from c. 25.8m permitted to c. 26.78m proposed and associated alterations to permitted hard and soft landscaping and permitted scheme's site services (mechanical and electrical, water supply, sewage disposal and surface water disposal). The total gross floor area of the hotel building increases by c. 317sq m (from c. 7,812 sq m permitted to c. 8,129 sq, proposed) with an increase in the number of hotel bedrooms proposed from 206 no. permitted to 219 no. proposed.
- Location
- Dublin 1, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 4009/23
Numbers and dates
- Floor area
- 7,812 m²
- Project type
- Infrastructure
- Received
- 22 Jun 2023
- Granted
- 16 Oct 2023
- Site start
- 1 Feb 2024
Timeline
- Application received
- Granted
- Site start
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 4009/23.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 1 Feb 2024Work started · Construction of new hotel development at Twilfit House, Dublin 1.View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.