Infrastructure · Co. Dublin
~2 homes, Co. Dublin
Granted 29 Nov 2023 (final grant issued 25 Sep 2025)
We no longer update this application, so we can't email you about it. Get new planning applications in Co. Dublin by email
Key facts
- Planning application 4057/23 at Co. Dublin: ~2 homes.
- It was received by Dublin City Council on 30 Jun 2023.
- Status: Granted 29 Nov 2023 (final grant issued 25 Sep 2025).
- Work was due to start on 11 Jun 2026, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 17 Nov 2026. Search the council's register
Council register
The council's register shows: Granted on 29 Nov 2023.
Search the Dublin City planning register
Application details as we last saw them in the national register on 17 Nov 2026.
What and where
~2 homes
The development will consist of construction of a new 220kV gas insulated switchgear (GIS) Switchboard building measuring 65.2 x 51.8m and 17m high; construction of 2no. new shunt reactor units (each within a 4.3m x 8.2m x 5.5m enclosure) and 1no. new series reactor unit (within a 4.7m x 12.7m x 16.6m enclosure), associated connections to the 220kV GIS switchboard building an decommissioning and removal of 2no. existing shunt reactors; an extension of the existing internal access road around the new GIS switchgear building and 4no. car parking spaces; all ancillary and associated works to facilitate the development including removal of existing perimeter berm and new 2.6m high boundary fence around extended substation compound, perimeter planting, 3m high lightning protection to new GIS switchboard building, surface water drainage network including an attenuation pond, lighting and laying of 2 temporary cable circuits for the construction and commissioning period connection the existing AIS building to the new GIS switchboard building and all other associated site excavation, raising of site levels, infrastructural and site development works above and below ground. Planning permission is sought for a period of 10 years. A Natura Impact (NIS) will be submitted to the Planning Authority with the application.
- Location
- Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 4057/23
Numbers and dates
- Homes
- ~2estimated from the application
- Project type
- Infrastructure
- Received
- 30 Jun 2023
- Decision to grant
- 29 Nov 2023
- Final grant
- 25 Sep 2025
- Site start notified
- 11 Jun 2026
Timeline
- Application received
- Decision to grant
- Appeal lodged
- Appeal decidedContribution Appeal Decided
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 4057/23.Search the register
- AppealContribution Appeal Decided · 318795 / 19 Mar 2025View the appeal record
How we know this
From the Dublin City Council planning register, as last seen on 17 Nov 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 11 Jun 2026Notice filed · 220kV GIS ESB substation comprising a two-storey building and external plinthsView the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.