Commercial new build · Co. Dublin
Diageo Brewery, bounded by James's Street, Watling Street, Victoria Quay and Steeven's Lane, Dublin 8
Granted 18 Feb 2022 (final grant issued 1 Apr 2022)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 8 by email
Key facts
- Planning application 4104/21 at Diageo Brewery, Bounded By James's Street, Watling Street, Victoria Quay and Steeven's Lane, Dublin 8: New extension to the existing beer processing plant.
- It was received by Dublin City Council on 16 Dec 2021.
- Status: Granted 18 Feb 2022 (final grant issued 1 Apr 2022).
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 8 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 18 Feb 2022.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
New extension to the existing beer processing plant
The proposed development will consist of a new extension to the existing beer processing plant to include a two storey building and six processing tanks. The proposed two storey extension has a total GFA of c. 1,024 sq.m and a building height to parapet level pof c. 14.4 m (20.9m OD). The building will be accessed via ground level doors and serviced through roller shutter doors on the southern elevation. The extension will be designed using new composite brown metal cladding similar to existing building materials within the brewery. The extension has a flat roof with a small plant area (c. 24 sq.m) screened by metal cladding panels and supportive steel frames. Six processing tanks c.24.52m (30.47m OD) are proposed to the north of the proposed extension. These tanks will be smaller than but visually match the existing tanks on site to the east. There will also be associated drainage connections to be made. The proposed development is located centrally within the brewery and is in accordance with the continued use of the site as a brewery. The proposal is located within a site which has an approved IE (Industrial Emissions) Licence (Ref No. P0301-04).
- Location
- Dublin 8, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 4104/21
Numbers and dates
- Floor area
- 1,024 m²
- Project type
- Commercial new build
- Received
- 16 Dec 2021
- Decision to grant
- 18 Feb 2022
- Final grant
- 1 Apr 2022
- Site start notified
- 20 Apr 2022
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 4104/21.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 20 Apr 2022Notice filed · phase 1 · The development will consist of the construction of a steel framed, composite clad...View the site start
- 4 Mar 2025Notice filed · phase 2 · This application is for the material alteration to provided additional floor area within...View the site start
- Completion certificate recordedRecorded in Apr 2022 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Mar 2025 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area