Site start · Co. Dublin
Dublin, Dublin
Granted 2 Oct 2024 (final grant issued 20 Nov 2024)
Key facts
- Site start record 4144/24 at Co. Dublin: Refurbishment, renovation and retrofitting works to an existing…
- The planning authority is Dublin City Council.
- Status: Granted 2 Oct 2024 (final grant issued 20 Nov 2024).
Source: the Dublin City Council planning register, as last seen on 12 Jul 2026. Search the council's register
Council register
The council's register shows: Granted on 2 Oct 2024.
Search the Dublin City planning register
Application details as we last saw them in the national register on 12 Jul 2026.
What and where
Refurbishment, renovation and retrofitting works to an existing…
Permission for development will consist of refurbishment, renovation and retrofitting works to an existing building (Dublin Port Centre and associated ancillary works, comprising: Reglazing and insulation upgrades to all building facades to include installation of louvres (brise soleil type); Revisions at roof level to include replacement of existing roof slab, construction of enclosed viewing gallery (c. 36sq.m) and open-air external accessible deck, reconfiguration of existing plant areas and antennae and provision for plant relocated from fifth floor level, all resulting in a revised total building height (excluding antennae) of c. 36.25m (increased from 34.15m) and a reduction of 39sq.m in gross floor area (GFA) to 60sq.m total; Removal of existing signs (2 no. signs of 9.2sq m each) on the northern and southern façades and provision for 3 no. illuminated corporate signs (combined C. 42.5sq.m) at roof level on the northern, southern and western facades; Internal layout modifications to provide for improved floorplates to include Lower Ground Floor GFA to be reduced by c. 11sq.m to c. 1407sq.m, Ground Floor GFA to be reduced by c. 45sq.m to c. 509sq.m and to include an extended mezzanine over ground floor level of C. 233sq.m (an increase of C. 82sq.m); Increase of GFA at fifth floor level from C. 440sq.m to C. 685sq.m (an increase of C. 245sq.m), facilitated by existing plant removal and relocation. Other associated works to include existing car park layout modifications resulting in a reduction of parking spaces (from 90 no. permitted spaces to 83 no. spaces), installation of electric vehicle charging units at 19 no. existing vehicle parking spaces (of which 2 no. are accessible spaces), provision of photovoltaic (PV) canopies (c. 700sq.m, 4.46m high) over car parking spaces; construction of a new ESB substation (c. 37sq.m, 3m high) and bicycle storage shed (c. 28.5sq.m, 3m high) and all other site works to include site clearance, landscaping, revised utilities and drainage arrangements.
- Location
- Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 4144/24
- Application type
- Commencement Notice
- Owner named on the notice
- Dublin Port Company
- Agent named on the notice
- John Sisk & Son Holding Ltd
Numbers and dates
- Floor area
- 5,589 m²
- Project type
- Infrastructure
- Received
- 12 Aug 2024
- Decision to grant
- 2 Oct 2024
- Final grant
- 20 Nov 2024
- Site start notified
- 5 Jan 2026
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 4144/24.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 5 Jan 2026Notice filed · phase 1 · Dublin Port Centre, Alexandra Road, Dublin 1: Works comprise of the refurbishment...View the site start
- 27 Feb 2026Notice filed · phase 2 · ESB Substation - Dublin Port Centre, The building to which this application refers to is...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.
Explore the area