Protected structure · Co. Dublin
2 Temple Villas, Palmerston Road, Rathmines, Dublin 6, D06P935
Granted 20 Sep 2023 (final grant issued 1 Nov 2023)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 6 by email
Key facts
- Planning application 4230/23 at 2 Temple Villas, Palmerston Road, Rathmines, Dublin 6, D06P935: Works to a protected structure.
- It was received by Dublin City Council on 27 Jul 2023.
- Status: Granted 20 Sep 2023 (final grant issued 1 Nov 2023).
- Work was due to start on 13 Mar 2024, according to the commencement notice. It does not say which contractors or suppliers are appointed.
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 6 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 20 Sep 2023.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Works to a protected structure
PROTECTED STRUCTURE: PERMISSION:The development will consist of the demolition of an existing 16.5 m² non-original single storey extension and a 5 m² out building to the rear and the subsequent erection of a new 71 m² single storey extension to rear including the partial removal of external walls to rear and side of main house including removal of chimneybreast at lower ground level and new lightweight partitions to accommodate the extension; External modifications to include repointing of the brick façades, refurbishment of existing windows and front door including fanlight to include slim-line double glazing; new entrance door to front elevation of existing side return and new timber panel adjacent; replacement timber door to front elevation of existing side passage with modification to existing parapet above. Existing cill lowered and non-original window replaced with new larger timber sash window to match existing at first floor level to side (south) elevation; 3no. new conservation rooflights and provision of 4no. new PV panels to west-facing inner roof valley of main roof; Alteration to existing single story lean-to roof (over proposed Bootroom) to allow for a greater pitch with new wider conservation rooflight. Replacement of 2no. non-original doors to rear of side return; new infill external brick wall to side passage and new raised parapet; Internal modifications to existing layout to include the installation of Calsitherm insulation to the internal side of the front, side and rear external walls; Modifications to Ground Floor include provision for new lightweight timber partitions and doors to create pantry, plant, utility, boot-room; Modifications to First Floor to include the infill of existing wall ope, retaining original door, new wall ope and re-using existing door to ensuite with provision of new lightweight timber partitions to ensuite and bathroom. Removal of non-original partitions to bathroom, infill existing non-original ope and provision for new partition to form linen store. Widening of external vehicular gateway from 2.5m to 3.0m clear width with associated modification of existing gate and all associated site works, general restoration and decoration works to No. 2 Temple Villas (A Protected Structure), a three-storey semi-detached dwelling with single storey side return.
- Location
- Dublin 6, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 4230/23
Numbers and dates
- Floor area
- 92 m²
- Project type
- Protected structure
- Received
- 27 Jul 2023
- Decision to grant
- 20 Sep 2023
- Final grant
- 1 Nov 2023
- Site start notified
- 13 Mar 2024
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 4230/23.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Commencement notices for this permission
- 13 Mar 2024Notice filed · Refurbishment of existing house and construction to a single storey extension to the...View the site start
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.