Site start · Co. Dublin
Dublin, Dublin
Site start 10 Sep 2024
Archived record
This application has left our current planning lists, so this page is no longer updated. We last saw it in the council's register on 12 Jul 2026. The details below are as they were then. The council's register has the current status.
What and where
PROTECTED STRUCTURE
PROTECTED STRUCTURE: Planning permission is sought for material alterations to the existing two storey mid-terrace mews office building (ridge height circa 7 metres above ground level). The mews was rebuilt in mid 20th Century and is within the curtiledge of a protected structure listed in the Dublin City Council Record of Protected Structures (RPS) No 357. The application includes the following works: - Removal of existing corrugated asbestos sheets roof and replaced with natural slate roof and reinstated to the original Mews ridge height (7.3 Meters above Ground Level) to align with adjacent terrace buildings. - Alterations to elevation to Little Fitzwilliam Place consisting of new door opening, new window opening and timber sliding sash at first floor, replacement of mid-20th Century casement window with timber sliding sash at first floor. - Removal of sand/cement render and replacement with lime harling coat finish. - Construction of first floor single storey extension (9.4 m²) to rear to incorporate wc facilities and winter garden balcony at first floor. - Internal alterations to include new access stairs at ground floor (5 m²), re-organisation of first floor office area (39.6 m²) featuring an open-plan office with new kitchenette. - New mechanical and electrical works throughout.
- Location
- Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 4707/22
- Applicant
- Carroll Estates Dublin Ltd
- Agent
- Mallantine Ltd
- Builder
- Mallantine Ltd
Key facts
- Floor area
- 52 m²
- Estimated construction value
- €170k to €250kOur estimate from floor area and project type, at January 2026 prices, building works only. Not a stated figure. How we estimate
- Project type
- Protected structure
- Site start
- 10 Sep 2024
- Protected structure
- Yes
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 4707/22.Search the register
- AppealGrant permission with revised conditions · 316848 / 4 Sep 2023View the appeal record
How we know this
From the Dublin City Council planning register, as last seen on 12 Jul 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 10 Sep 2024Work started · Construction of extension with internal and external alterations to the existing two...
- Completion certificate recordedRecorded in Sep 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 1 Oct 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.