Refurbishment and temporary fit-out works to the Printing House, Dublin 2, Co. Dublin
Granted 28 Oct 2022 (final grant issued 29 Nov 2022)
We no longer update this application, so we can't email you about it. Get new planning applications in Dublin 2 by email
Key facts
- Planning application 4785/22 at Dublin 2, Co. Dublin: Refurbishment and temporary fit-out works to the Printing House.
- It was received by Dublin City Council on 5 Sep 2022.
- Status: Granted 28 Oct 2022 (final grant issued 29 Nov 2022).
Source: the Dublin City Council planning register, as last seen on 2 Jun 2026. Search the council's register
More planning applications in Dublin 2 · Planning applications in Co. Dublin
Council register
The council's register shows: Granted on 28 Oct 2022.
Search the Dublin City planning register
Application details as we last saw them in the national register on 2 Jun 2026.
What and where
Refurbishment and temporary fit-out works to the Printing House
PROTECTED STRUCTURE: The proposed development consists of the following: 1. Refurbishment and temporary fit-out works to the Printing House, and a temporary change of use for a period of five years, to allow it to operate as an exhibition space to include: A temporary fit-out, for a period of five years, to the Printing House (360 m²), incorporating an exhibition room with display case relocated from the Old Library, secure storage rooms, security office, and WC at ground floor level and associated plant space at basement level. The fit-out works will include the installation of demountable reversible steel and concrete structures, steel framed metal stud partitions, timber and steel doors, fire curtain, blockwork walls, and associated services including sprinkler system, ventilation, heating, cooling, information technology and electrical systems. Internal refurbishment, including insulation of the roof, upgrading fire rating of historic floors retaining all historic elements, upgrading fire resistance of three historic doors, temporary removal and storage on site of one door leaf, redecoration of interior at ground level including the entrance hall. External refurbishment works consisting of pointing the east elevation to replace variety of non-historic finishes, cleaning of the Portland stone portico and Calp rubble side elevations, refurbishment of historic railings and replacement of non-historic boiler room door. The construction of a demountable steel temporary structure (29 sq.m) along the eastern edge of the Printing House to provide an accessible entrance through an existing doorway, involving widening of the door opening. 2. The construction of a Temporary Pavilion in New Square, for a period of five years, with a gross internal area of 900 m² comprising of an exhibition space (576 m²), retail space (170 m²), WCs, staff room, storage and plant space. The temporary pavilion is organised in two building volumes, ranging in height from 6.7m to 9.9m. The building will have a metal structure, and will be clad with coloured metal panels. A screened temporary external plant enclosure (72 m²) will be located to the rear of the Temporary Pavilion. 3. Landscaping including temporary sloped surfaces in New Square to provide accessible entrances to the Temporary Pavilion, reseeding of lawn, temporary removal of 2 sections of chain around the perimeter of New Square. 4. The provision of a temporary sign, for a period of five years, located at the western facade of House 33-37 (a Protected Structure) of c. 1m x 9m and an exterior temporary, for a period of five years, wayfinding feature light fixed to the rear brick-faced facade of Houses 33-37. 5. Permission is also sought for all associated site development above and below ground and temporary construction operations.
- Location
- Dublin 2, Co. Dublin Map
- Council
- Dublin City Council
- Planning reference
- 4785/22
Numbers and dates
- Floor area
- 2,107 m²
- Project type
- Public / civic
- Received
- 5 Sep 2022
- Decision to grant
- 28 Oct 2022
- Final grant
- 29 Nov 2022
- Site start notified
- 3 Jan 2023
- Protected structure
- Yes
Timeline
- Application received
- Decision to grant
- Final grant issued
- Site start notified
Outlook
What happens next
Work packages named so far
Documents and evidence
Check the record
- Council planning registerSearch planning.agileapplications.ie for reference 4785/22.Search the register
How we know this
From the Dublin City Council planning register, as last seen on 2 Jun 2026. The council's own file is the official record.
Site starts
Site starts and completion
- 3 Jan 2023Notice filed · phase 1 · Construction of a new single storey temporary pavilion for use as an exhibition and...Notice re-filed 10 Feb 2023 for the same works.View the site start
- 17 Jan 2024Notice filed · phase 2 · The proposed development consists of refurbishment and temporary fit-out works to the...View the site start
- Completion certificate recordedRecorded in Feb 2023 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
- Completion certificate recordedRecorded in Jan 2024 · 1 unit on this certificateThe month is when the certificate was published, not the date the work finished. The certificate does not say whether it covers all or part of the work. Units on this certificate are not added to other certificates or to the planning total. Last checked 15 Nov 2026.
A commencement notice tells the council that building work is about to start. A completion certificate is filed when it is finished.